Difference between revisions of "FTC 7314 Engineering Notebook 2015-10-19"
From DEW Robotics
TheBadJosh (talk | contribs) |
TheBadJosh (talk | contribs) |
||
Line 17: | Line 17: | ||
!Objectives / Systems !! Hypotheses, tests, observations, conclusions, plans | !Objectives / Systems !! Hypotheses, tests, observations, conclusions, plans | ||
|- | |- | ||
− | | ''' | + | | '''Intake''' |
| | | | ||
* Daniel worked on the intake, he helped build the new intake slapper devices. These were mounted on continuous servos. this new design had two slappers that went in opposite directions like a gear | * Daniel worked on the intake, he helped build the new intake slapper devices. These were mounted on continuous servos. this new design had two slappers that went in opposite directions like a gear |
Revision as of 04:16, 4 December 2015
Competition Season Meeting
Meeting Date | Meeting Time | Location | Attendees |
---|---|---|---|
19-October-2015 | 6:00-9:00 PM | TCHS Brandywine | Josh, Akhila, Braden, Bennett, Seth, Trent, Daniel, Wade, Myles, Amal, Jacob, Trevor |
Objectives / Systems | Hypotheses, tests, observations, conclusions, plans |
---|---|
Intake |
|
Milling pieces |
|
Tasks | Reflections |
---|---|
Programming | Task: Programming
They had trouble with the rotation number because the number listed online was a lot bigger than the ones they were plugging in. This resulted in the robot remaining irresponsive. The issue was really frustrating because figuring out the encoder situation is the first step to a successful autonomous. They also had problems with configuring the encoders. They will try to figure this out next time, and hopefully crack the code (pun intended). |
Task in bold |
|
Action and idea Journal
Seth & Clem McKown working on track system
Recorded by: | Date: | Journal Editor: | Date: |
---|---|---|---|