Difference between revisions of "FTC 7314 Engineering Notebook 2015-10-19"
From DEW Robotics
MaiKangWei (talk | contribs) |
MaiKangWei (talk | contribs) |
||
Line 26: | Line 26: | ||
*Trent was putting together treads with miles and was milling with josh | *Trent was putting together treads with miles and was milling with josh | ||
|- | |- | ||
− | | ''' | + | | '''Milling pieces''' |
| | | | ||
− | * | + | * Josh worked with Bennett in order to mill and drill the remaining drive chain pieces. They completed cutting all of the pieces, and josh has set up the mill to drill the angled pieces. |
+ | * Bennett worked with Josh to help drill and cut the drive chain pieces. | ||
|} <!-- End of tasks table; DO NOT REMOVE --> | |} <!-- End of tasks table; DO NOT REMOVE --> |
Revision as of 00:49, 20 October 2015
Competition Season Meeting
Meeting Date | Meeting Time | Location | Attendees |
---|---|---|---|
19-October-2015 | 6:00-9:00 PM | TCHS Brandywine |
Objectives / Systems | Hypotheses, tests, observations, conclusions, plans |
---|---|
Daniel,Myles, Trever and braden worked on building the Intake |
|
Milling pieces |
|
Action and idea Journal
Tasks | Reflections |
---|---|
Task in bold |
|
Task in bold |
|
Recorded by: | Date: | Journal Editor: | Date: |
---|---|---|---|