Difference between revisions of "FTC 7314 Engineering Notebook 2015-11-02"
From DEW Robotics
MaiKangWei (talk | contribs) |
MaiKangWei (talk | contribs) |
||
Line 23: | Line 23: | ||
* Bullet point for each hypothesis, test, observation, conclusion, plan | * Bullet point for each hypothesis, test, observation, conclusion, plan | ||
|- | |- | ||
− | | ''' | + | | '''Climber Placement''' |
| | | | ||
− | * | + | * Myles helped find dimensions for the bucket and gave moral support. |
|} <!-- End of tasks table; DO NOT REMOVE --> | |} <!-- End of tasks table; DO NOT REMOVE --> |
Revision as of 01:31, 3 November 2015
Competition Season Meeting
Meeting Date | Meeting Time | Location | Attendees |
---|---|---|---|
2-November-2015 | 6:00-9:00 PM | TCHS Brandywine |
Objectives / Systems | Hypotheses, tests, observations, conclusions, plans |
---|---|
Daniel and Bennet drilled holes
|
|
Climber Placement |
|
Tasks | Reflections |
---|---|
Task in bold |
|
Task in bold |
|
Action and idea Journal
Drawings
Drive base PP panel on ResQ robot - Rev 3 Provides mounting for (2) solenoid controllers and (1) solenoid
Recorded by: | Date: | Journal Editor: | Date: |
---|---|---|---|