Difference between revisions of "FTC 7314 Engineering Notebook 2015-11-21"

From DEW Robotics
Jump to: navigation, search
(Created page with '=='''Competition Season Meeting'''== <!-- This is the meeting information table --> {|border=1 cellpadding="10" !Meeting Date !!Meeting Time !!Location !!Attendees |- | 21-Novem...')
 
Line 8: Line 8:
 
| 2:00-5:00pm
 
| 2:00-5:00pm
 
| TCHS Brandywine
 
| TCHS Brandywine
|  
+
| Amal, Josh, Justin, Braden, Myles
 
|}
 
|}
  
Line 33: Line 33:
 
!Tasks !! Reflections
 
!Tasks !! Reflections
 
|-  
 
|-  
| '''Task in bold'''
+
| '''assembling the field'''
 
|  
 
|  
* Bullet point for each reflection
+
* Josh, Justin, and Amal finished assembling the second mountain for the new field. They plan to use this mountain for testing, as the first mountain has some issues with how it was constructed. They plan to fix these issues next meeting after gaining more supplies. Josh also informed the rest of the team to wear only socks or barefoot on the field as to make sure it is in pristine condition.
 
|-
 
|-
| '''Task in bold'''
+
| '''Field build finish, and robot test'''
 
|  
 
|  
* Bullet point for each reflection
+
* Josh, Justin, and Amal finished building the field that we bought along with the Auto bots team 3499. Also the everyone watch and performed the mountain climb test, our team is around 10 seconds.
 
+
|-
 +
| '''Workshop'''
 +
|
 +
*
 
|} <!-- End of tasks table; DO NOT REMOVE -->
 
|} <!-- End of tasks table; DO NOT REMOVE -->
  

Revision as of 22:04, 21 November 2015

Competition Season Meeting

Meeting Date Meeting Time Location Attendees
21-November-2015 2:00-5:00pm TCHS Brandywine Amal, Josh, Justin, Braden, Myles


Objectives / Systems Hypotheses, tests, observations, conclusions, plans
Objective in bold
  • Bullet point for each hypothesis, test, observation, conclusion, plan
Objective in bold
  • Bullet point for each hypothesis, test, observation, conclusion, plan


Tasks Reflections
assembling the field
  • Josh, Justin, and Amal finished assembling the second mountain for the new field. They plan to use this mountain for testing, as the first mountain has some issues with how it was constructed. They plan to fix these issues next meeting after gaining more supplies. Josh also informed the rest of the team to wear only socks or barefoot on the field as to make sure it is in pristine condition.
Field build finish, and robot test
  • Josh, Justin, and Amal finished building the field that we bought along with the Auto bots team 3499. Also the everyone watch and performed the mountain climb test, our team is around 10 seconds.
Workshop


Recorded by: Date: Journal Editor: Date: