Difference between revisions of "FTC 7314 Engineering Notebook 2015-11-28"
From DEW Robotics
TheBadJosh (talk | contribs) |
TheBadJosh (talk | contribs) |
||
Line 6: | Line 6: | ||
|- | |- | ||
| 11/28/2015 | | 11/28/2015 | ||
− | | | + | | 12:00-5:00 |
| TCHS Brandywine | | TCHS Brandywine | ||
− | | | + | | Amal, Trevor, Josh, Akhila, Braiden, Daniel, Bennett, Matt |
|} | |} | ||
Line 17: | Line 17: | ||
!Objectives / Systems !! Hypotheses, tests, observations, conclusions, plans | !Objectives / Systems !! Hypotheses, tests, observations, conclusions, plans | ||
|- | |- | ||
− | | ''' | + | | '''Programming''' |
| | | | ||
− | * | + | * The programming team added support for controlling the front climbing arm as well as changed the existing code to operate with the final robot hardware. |
|- | |- | ||
| '''Objective in bold''' | | '''Objective in bold''' |
Revision as of 20:40, 28 November 2015
Competition Season Meeting
Meeting Date | Meeting Time | Location | Attendees |
---|---|---|---|
11/28/2015 | 12:00-5:00 | TCHS Brandywine | Amal, Trevor, Josh, Akhila, Braiden, Daniel, Bennett, Matt |
Objectives / Systems | Hypotheses, tests, observations, conclusions, plans |
---|---|
Programming |
|
Objective in bold |
|
Tasks | Reflections |
---|---|
Task in bold |
|
Task in bold |
|
Recorded by: | Date: | Journal Editor: | Date: |
---|---|---|---|