Difference between revisions of "FTC 7314 Engineering Notebook 2015-11-28"
From DEW Robotics
TheBadJosh (talk | contribs) |
Akhila2014 (talk | contribs) (→Competition Season Meeting) |
||
Line 20: | Line 20: | ||
| | | | ||
* The programming team added support for controlling the front climbing arm as well as changed the existing code to operate with the final robot hardware. | * The programming team added support for controlling the front climbing arm as well as changed the existing code to operate with the final robot hardware. | ||
− | |||
− | |||
− | |||
− | |||
|} <!-- End of tasks table; DO NOT REMOVE --> | |} <!-- End of tasks table; DO NOT REMOVE --> |
Latest revision as of 12:20, 4 December 2015
Competition Season Meeting
Meeting Date | Meeting Time | Location | Attendees |
---|---|---|---|
11/28/2015 | 12:00-5:00 | TCHS Brandywine | Amal, Trevor, Josh, Akhila, Braiden, Daniel, Bennett, Matt |
Objectives / Systems | Hypotheses, tests, observations, conclusions, plans |
---|---|
Programming |
|
Tasks | Reflections |
---|---|
Programming |
|
Robot polishing |
|
Action and idea Journal
Recorded by: | Date: | Journal Editor: | Date: |
---|---|---|---|