Difference between revisions of "FTC 7314 Engineering Notebook 2016-02-06"
From DEW Robotics
(Created page with '=='''Competition Season Meeting'''== <!-- This is the meeting information table --> {|border=1 cellpadding="10" !Meeting Date !!Meeting Time !!Location !!Attendees |- | | | TC...') |
(→Mechanical) |
||
Line 15: | Line 15: | ||
-Fixing Debris Loss On Mountain | -Fixing Debris Loss On Mountain | ||
− | -Myles thought of ideas for keeping debris from flying out the mountain, he then tested them on the robot. | + | :-Myles thought of ideas for keeping debris from flying out the mountain, he then tested them on the robot. |
-Fixing the Tread Bearing | -Fixing the Tread Bearing | ||
− | + | :-Bennett helped Matt push out a tread bearing that had sunk in too far into the arm frame. | |
-Re-soldering the Beacon Battery Holster | -Re-soldering the Beacon Battery Holster | ||
Line 25: | Line 25: | ||
:- | :- | ||
+ | |||
==Programming== | ==Programming== | ||
Revision as of 20:53, 6 February 2016
Competition Season Meeting
Meeting Date | Meeting Time | Location | Attendees |
---|---|---|---|
TCHS Brandywine |
CAD & Design
Mechanical
-Fixing Debris Loss On Mountain
- -Myles thought of ideas for keeping debris from flying out the mountain, he then tested them on the robot.
-Fixing the Tread Bearing
- -Bennett helped Matt push out a tread bearing that had sunk in too far into the arm frame.
-Re-soldering the Beacon Battery Holster
- -Snarr prepared his workspace for re-soldering a loose wire that connects to the beacon battery holster. He soldered the wire back to the holster and the beacon worked afterwards.
- -
Programming
Field Elements
Recorded by: | Date: | Journal Editor: | Date: |
---|---|---|---|