Difference between revisions of "FTC 7314 Engineering Notebook 2016-02-06"

From DEW Robotics
Jump to: navigation, search
(Mechanical)
(Mechanical)
Line 21: Line 21:
  
 
-Re-soldering the Beacon Battery Holster
 
-Re-soldering the Beacon Battery Holster
:-Snarr prepared his workspace for re-soldering a loose wire that connects to the beacon battery holster. He soldered the wire back to the holster and the beacon worked afterwards.
+
:-Snarr prepared his work space for re-soldering a loose wire that connects to the beacon battery holster. He soldered the wire back to the holster and the beacon worked afterwards.
  
 
+
-
:-
 
  
 
==Programming==
 
==Programming==

Revision as of 20:54, 6 February 2016

Competition Season Meeting

Meeting Date Meeting Time Location Attendees
TCHS Brandywine

CAD & Design

Mechanical

-Fixing Debris Loss On Mountain

-Myles thought of ideas for keeping debris from flying out the mountain, he then tested them on the robot.

-Fixing the Tread Bearing

-Bennett helped Matt push out a tread bearing that had sunk in too far into the arm frame.

-Re-soldering the Beacon Battery Holster

-Snarr prepared his work space for re-soldering a loose wire that connects to the beacon battery holster. He soldered the wire back to the holster and the beacon worked afterwards.

-

Programming

Field Elements



Recorded by: Date: Journal Editor: Date: