FTC 7314 build November 2013

From DEW Robotics
Revision as of 01:19, 1 December 2013 by MaiKangWei (talk | contribs) (30-November)

Jump to: navigation, search

2-November

Ramp Riot!

7-November

9-November

11-November

14-November

15-November

16-November

21-November

30-November

Nicholas & Julie Christopher work on communications issues
Programming: Nicholas & Julie worked on communications issues with the Samantha. These were not resolved during the meeting.

Mechanical: Rebuilt the arm drive by replacing the original 4.7mm D-shaft with a 0.25" diam steel shaft with 3/32" keyway. His change required the following:

  1. Bore out the driven brass worm gear to 0.250" ID
  2. Broach a 3/32" keyway in the worm rear ID
  3. Drill the output shaft bushing holes on the worm gearbox to 3/8" (from 8mm)
  4. Replace output shaft bushings with 0.25" ID bronze flange bushings (1/2" long)
  5. Assemble output worm gear and shaft w/ key
  6. Re-assemble input shaft with dual motors and worm
  7. Bore