==30-November==
 
==30-November==
 +
[[image:FTC7314_131130_csm.jpg|250px|right|thumb|Nicholas & Julie Christopher work on communications issues]]Programming: Nicholas & Julie worked on communications issues with the Samantha.  These were not resolved during the meeting.
  
 +
Mechanical: Rebuilt the arm drive by replacing the original 4.7mm D-shaft with a 0.25" diam steel shaft with 3/32" keyway.  His change required the following:
 +
# Bore out the driven brass worm gear to 0.250" ID
 +
# Broach a 3/32" keyway in the worm rear ID
 +
# Drill the output shaft bushing holes on the worm gearbox to 3/8" (from 8mm)
 +
# Replace output shaft bushings with 0.25" ID bronze flange bushings (1/2" long)
 +
# Assemble output worm gear and shaft w/ key
 +
# Re-assemble input shaft with dual motors and worm
 +
# Bore
  
 
----
 
----
 
[[Category:FTC]][[Category:Block Party!]]
 
[[Category:FTC]][[Category:Block Party!]]

Revision as of 01:19, 1 December 2013

2-November

Ramp Riot!

7-November

9-November

11-November

14-November

15-November

16-November

21-November

30-November

Nicholas & Julie Christopher work on communications issues
Programming: Nicholas & Julie worked on communications issues with the Samantha. These were not resolved during the meeting.

Mechanical: Rebuilt the arm drive by replacing the original 4.7mm D-shaft with a 0.25" diam steel shaft with 3/32" keyway. His change required the following:

  1. Bore out the driven brass worm gear to 0.250" ID
  2. Broach a 3/32" keyway in the worm rear ID
  3. Drill the output shaft bushing holes on the worm gearbox to 3/8" (from 8mm)
  4. Replace output shaft bushings with 0.25" ID bronze flange bushings (1/2" long)
  5. Assemble output worm gear and shaft w/ key
  6. Re-assemble input shaft with dual motors and worm
  7. Bore