Difference between revisions of "FTC 7314 build October 2013"

From DEW Robotics
Jump to: navigation, search
(17-October: Notebook diagram)
(31-October)
 
(8 intermediate revisions by 2 users not shown)
Line 34: Line 34:
  
 
==17-October==
 
==17-October==
[[Image:FTC7314_notebook_20131017_1.jpg|left|250px|thumb|Testing the shovel]]
+
<gallery widths=250 heights=250 perrow=3>
 +
Image:FTC7314_notebook_20131017_1.jpg|Testing the shovel
 +
image:FTC7314_131017.jpg|SolidWorks rendering
 +
image:FTC7314_131017_csm-2.jpg|building arm
 +
image:FTC7314_131017_csm-3.jpg|testing arm
 +
</gallery>
 +
 
 +
Worked on the shovel and prepared for Duel on the Delaware.
  
 
==19-October - [[DEWBOT IX Duel on the Delaware | Duel on the Delaware]]==
 
==19-October - [[DEWBOT IX Duel on the Delaware | Duel on the Delaware]]==
Line 49: Line 56:
 
Image:DB9_DD_131019_csm-21.jpg|Brad, Andrew Weissman & Eric
 
Image:DB9_DD_131019_csm-21.jpg|Brad, Andrew Weissman & Eric
 
Image:DB9_DD_131019_csm-22.jpg|CJ
 
Image:DB9_DD_131019_csm-22.jpg|CJ
 +
Image:FTC7314_notebook_20131019_1.jpg|Connection of intake to arm
 
</gallery>
 
</gallery>
  
Line 76: Line 84:
 
Image:FTC7413_131026_csm-5.jpg|Electronics panel
 
Image:FTC7413_131026_csm-5.jpg|Electronics panel
 
Image:FTC7413_131026_csm-6.jpg|Robot
 
Image:FTC7413_131026_csm-6.jpg|Robot
 +
Image:FTC7314_notebook_20131026_1.jpg|Electronics panel, flag device, IR sensors
 +
Image:FTC7314_notebook_20131026_2.jpg|Flag crank configuration
 
</gallery>
 
</gallery>
  
Line 88: Line 98:
  
 
----
 
----
[[Category:FTC]][[Category:Block Party!]]
+
[[Category:FTC]][[Category:Block Party!]][[Category:Photo Galleries]]

Latest revision as of 21:23, 1 December 2013

3-October

5-October

10-October

12-October

17-October

Worked on the shovel and prepared for Duel on the Delaware.

19-October - Duel on the Delaware

24-October

26-October

A productive day. We:

  • Cut, bent and otherwise fabricated and installed the robot's electronics panels...
  • ...and rationally installed many of the key electronic components (NXT & Motor Controllers)
  • Replaced the 4:1 worm gear with 20:1
  • Started mounting IR Seeker sensors
  • Built the lower part of the flag pole
  • Installed the flag lift
  • Scoped out where the limit switches ought to be mounted
  • Worked on autonomous coding

31-October

A short crew for this meeting (CJ & Clem). In spite of this, we got a lot of work completed:

  • Finished and tested the Flag Lift. Finishing included cutting the crank arms shorter and installing hard, slippery PTFE-impregnated Acetal (polyoxymethylene) contact plates on the teterix beam surfaces restraining the crack blades.
  • The arm motor was changed (old one dead) and tested.
  • The power switch and battery were logically (but perhaps not optimally) mounted.
  • The NXT was shifted to move it away from the frame perimeter for safety.
  • The battery, switch and motor controllers were wired. Wired were dressed using wire ties.