− | Started printing the first of four Flanges meant to go onto the climbing system. Each Flange takes 2:30 hrs to print. Meanwhile other parts that need printing are | + | Started printing the first of four Flanges meant to go onto the climbing system. Each Flange takes 2:30 hrs to print. Meanwhile other parts that need printing are: |
+ | 6 17-tooth timing pulleys | ||
+ | Talon covers | ||
+ | Housing Cases for all on-board cameras (cameras for this year are undecided) | ||
+ | Modified Pi 3 case to fit on top of existing Ethernet Switch | ||
==Mechanical== | ==Mechanical== |
Revision as of 18:40, 18 February 2017
Contents
CAD & Design
CAM Lead- Patrick
Started printing the first of four Flanges meant to go onto the climbing system. Each Flange takes 2:30 hrs to print. Meanwhile other parts that need printing are: 6 17-tooth timing pulleys Talon covers Housing Cases for all on-board cameras (cameras for this year are undecided) Modified Pi 3 case to fit on top of existing Ethernet Switch