Started printing the first of four Flanges meant to go onto the climbing system. Each Flange takes 2:30 hrs to print. Meanwhile other parts that need printing are: | Started printing the first of four Flanges meant to go onto the climbing system. Each Flange takes 2:30 hrs to print. Meanwhile other parts that need printing are: | ||
+ | |||
6 17-tooth timing pulleys | 6 17-tooth timing pulleys | ||
+ | |||
Talon covers | Talon covers | ||
+ | |||
Housing Cases for all on-board cameras (cameras for this year are undecided) | Housing Cases for all on-board cameras (cameras for this year are undecided) | ||
+ | |||
Modified Pi 3 case to fit on top of existing Ethernet Switch | Modified Pi 3 case to fit on top of existing Ethernet Switch | ||
Revision as of 18:41, 18 February 2017
Contents
CAD & Design
CAM Lead- Patrick
Started printing the first of four Flanges meant to go onto the climbing system. Each Flange takes 2:30 hrs to print. Meanwhile other parts that need printing are:
6 17-tooth timing pulleys
Talon covers
Housing Cases for all on-board cameras (cameras for this year are undecided)
Modified Pi 3 case to fit on top of existing Ethernet Switch