Search results

From DEW Robotics
Jump to: navigation, search
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...t, pasting on the metal, and cutting the metal around it. This reduced the time of manufacturing greatly, and was fun to do as well!
    2 KB (360 words) - 23:12, 23 December 2014
  • !Meeting Date !!Meeting Time !!Location !!Attendees * Akhila also learned the drive controls for the first time. She does not quite know if she liked them well enough to drive, but it was
    4 KB (697 words) - 01:24, 2 December 2014
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...ook the encoder code out temporarily to test the IR values, due to lack of time. They will attach the encoders next meeting.
    2 KB (340 words) - 01:31, 2 December 2014
  • !Meeting Date !!Meeting Time !!Location !!Attendees!
    2 KB (308 words) - 01:38, 2 December 2014
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (310 words) - 05:54, 23 November 2014
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...reliable. No one can expect the robot to be set up at the same angle every time. Now, it starts with the robot all the way to the right of the parking zone
    4 KB (638 words) - 23:19, 23 December 2014
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...some polypropylene. She used a caliper to be very exact, which was pretty time consuming.
    4 KB (633 words) - 23:36, 23 December 2014
  • !Meeting Date !!Meeting Time !!Location !!Attendees * She tapped the hole, which was her first time using the tap.
    4 KB (695 words) - 23:39, 23 December 2014
  • !Meeting Date !!Meeting Time !!Location !!Attendees * Fortunately, Akhila used the right drill bit this time (thanks to the app iEngineer).
    2 KB (327 words) - 23:48, 4 December 2014
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...k a long time to mill. One cut took 7:42 to complete, which is a very long time.
    4 KB (696 words) - 22:55, 11 January 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees * Since it is a full competition, the scouting sheets took up a LOT of time. It was a little tedious, but it kind of fun to see the different team name
    3 KB (452 words) - 23:34, 11 January 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees * Laura was very happy to see it move for the first time.
    2 KB (286 words) - 04:03, 5 December 2014
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (372 words) - 23:38, 11 January 2015
  • ...the 2014-2015 season. We had just turned on the robot for the very first time the night before, so we were really just barely ready for this tournament.
    3 KB (512 words) - 14:24, 13 December 2014
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (358 words) - 03:13, 12 January 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...However, driver practice was extended eliminating the majority of testing time for autonomous.
    3 KB (483 words) - 03:17, 12 January 2015
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance:
    1 KB (232 words) - 23:48, 14 April 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (309 words) - 19:31, 27 December 2014
  • ...School. 1640's first qualifier for the 2015 season and our 4<sup>th</sup> time at the Hatboro-Horsham MAR Qualifier - every year since the start of MAR.
    5 KB (782 words) - 14:27, 5 July 2015
  • ...le NJ. 1640's second qualifier for the 2015 season and our 3<sup>th</sup> time at the Lenepe-Seneca MAR Qualifier.
    376 bytes (53 words) - 19:22, 21 December 2014
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...der to try to get an outreach event with them. Josh has to call at a later time because the person who could plan it was absent. He also attempted to call
    3 KB (572 words) - 21:33, 12 January 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...0 cm heights. This is still buggy and will need to be worked on at a later time.
    5 KB (908 words) - 21:36, 12 January 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    3 KB (419 words) - 21:40, 12 January 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (273 words) - 03:25, 14 January 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees * Next time they work on auton, they will be able to continue to write the code to line
    3 KB (437 words) - 03:28, 14 January 2015
  • On the way home, we continued an ancient and time-honored team tradition by spending the morning of Sunday, 20-July at the [h
    13 KB (1,950 words) - 11:19, 28 December 2016
  • *More human player station testing - how to get the first tote in right every time
    13 KB (1,882 words) - 06:05, 16 February 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...nfortunately lost the sprocket for the chain drive. He searched for a long time and finally found the sprocket and fixed the wheel so it could be bored.
    2 KB (407 words) - 03:35, 14 January 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...hrough a mock judging process in which they did a decent job for their 2nd time.
    1 KB (209 words) - 23:42, 15 January 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (269 words) - 21:44, 15 January 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    3 KB (447 words) - 21:46, 14 January 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees * Instead of replacing the clutch every time it wore down, Laura decided to try to write a software clutch.
    2 KB (263 words) - 23:26, 15 January 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (265 words) - 23:54, 15 January 2015
  • ...Edgetech as sponsor, we redesigned our swerve module to reduce the machine time requirements and to bring as much of the machining in-house as practical. ...ure, we revised the pivot design with an objective of reducing the machine time required to produce these, making the following changes:
    5 KB (768 words) - 14:59, 20 September 2015
  • ...le NJ. 1640's second qualifier for the 2015 season and our 3<sup>rd</sup> time at the Seneca (a.k.a. Lenape-Seneca) MAR Qualifier.
    5 KB (782 words) - 22:55, 20 April 2015
  • ...nd chains. All new parts were employed, not splices. This change-out was time-consuming. The shorter lift had required us to back the robot up from the
    5 KB (865 words) - 02:06, 21 April 2015
  • ...Step RCs will almost certainly win the match. It's also obvious that the time to gain control of the Step RCs is at the very start of the match; the firs ...striking the RC. By reducing flexure, the bounce is reduced and therefore time before driving backwards also reduced.
    4 KB (692 words) - 01:44, 30 May 2015
  • ...rks Professional Exam, which covers slightly more material at a much lower time limit.
    5 KB (748 words) - 17:09, 25 July 2015
  • ...reducing the probability of it landing on end (recoverable, but a waste of time). ...'s travel and so these rods are constrained by the stacker and at the same time do not constrain the stacker lift's travel.
    6 KB (942 words) - 13:31, 5 July 2015
  • But different is what we do. It's what we are. At least we think so. Time to put that to the test! ...t the Westtown School) and 1640 and was a huge success. This was the first time the two teams had worked together to host a robotics tournament. According
    12 KB (1,832 words) - 01:35, 6 May 2017
  • ...in 2008 (with a [[DEWBOT IV Duel on the Delaware | terrible robot]]) and 4-time winners in [[DEWBOT VII Duel on the Delaware | 2011]], [[DEWBOT VIII Duel o ...drive team, with a special fedoras-off to first-time driver Abbi and first-time human player Kevin! Thanks to Ian, who took on the challenging lead scout j
    2 KB (403 words) - 23:01, 18 October 2015
  • *driving over noodles. 118 spent time clearing noodles off the platform for us that they couldve spent stacking. ...ho's stacking from where and which platform space people will use but what time in the match we'll throw noodles, which alliance stations people should be
    7 KB (1,278 words) - 23:15, 24 July 2015
  • *FRC Qualifier w/ Metal Moose – unknown at time
    3 KB (402 words) - 21:54, 4 August 2015
  • ...with the FLL scrimmage. We do not have the people to do both at the same time. We resolved to shift the date to 28-November (but this date is unavailabl
    1 KB (192 words) - 01:14, 19 August 2015
  • :First time at Worlds! The team finished 17<sup>th</sup> in Franklin Division.
    6 KB (905 words) - 21:45, 10 June 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees * After all the pre presentations were over, it was time for the game reveal! There was a real sense of suspense in the room as we c
    5 KB (820 words) - 19:38, 27 November 2015
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance:
    883 bytes (125 words) - 19:46, 13 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance: ...tonomous scenarios. It's always great fun, and allows us to gauge how much time will be needed for each scenario. We're clocking in at a little less than t
    4 KB (748 words) - 23:20, 27 November 2015
  • **Need to breach every time
    2 KB (228 words) - 15:38, 26 March 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...to the legacy module went bad. There had been connection issues the entire time, but initially, just disconnecting and reconnecting would work. Toward the
    5 KB (781 words) - 06:12, 4 December 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...esign for an intake that involved a box that lifts 1 piece of debris at at time on a vertical conveyor belt.
    4 KB (671 words) - 02:45, 30 November 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...treads. They put the rubber tread grips into the treads. This took a long time and Gary reported that his arm ached after he slid all the pieces into thei
    3 KB (374 words) - 03:12, 30 November 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    4 KB (686 words) - 04:07, 4 December 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...have quite enough time to finish the test, and will look at it at a later time.
    4 KB (548 words) - 03:49, 4 December 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    3 KB (528 words) - 04:17, 4 December 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (370 words) - 12:16, 11 October 2015
  • # Time. Additional time to manufacture, assemble, and source must be acceptable in the build season
    3 KB (560 words) - 21:08, 15 October 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...y were only able to do it once. They were happy because this was the first time they tried to get up the mountain and getting up successfully once meant a
    5 KB (817 words) - 00:52, 10 November 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (257 words) - 04:10, 4 December 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...g together treads with miles and was milling with Josh. This was his first time milling, and he was really surprised at how precise someone has to be when
    4 KB (684 words) - 04:44, 4 December 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (327 words) - 04:54, 4 December 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...We milled parts, taped holes,and rough-cut parts to mill now and for next time.
    2 KB (377 words) - 04:48, 4 December 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...t method to sand the axles in order to fit the bearings. This took a long time for Braden to figure out.
    5 KB (784 words) - 06:46, 4 December 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...ry and got a bit of progress. I feel we were way more productive then last time and could inprove apoun it even more tomorrow if we keep up the good work.
    5 KB (805 words) - 06:50, 4 December 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    3 KB (413 words) - 00:33, 17 November 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (386 words) - 06:11, 4 December 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    3 KB (486 words) - 07:00, 4 December 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...he help of Mr. Abersold, resumed their work on the beacon autonomous. Last time they worked on this, there were a plethora of problems, including color sen
    4 KB (631 words) - 07:22, 4 December 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    3 KB (394 words) - 05:55, 4 December 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees * This meeting, Akhila and Jacob closely monitored the logs each time the program was run, something that wasn't paid attention to before. They f
    5 KB (779 words) - 05:35, 3 December 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...decided to work on setting up the code for teleop. When this was done last time, only the joysticks were coded, and seeing as the robot can do more than ju
    4 KB (640 words) - 12:20, 4 December 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...he will bring the tread home to finish it. Josh then spent the rest of the time helping to test the robot's climbability.
    4 KB (619 words) - 12:32, 4 December 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    3 KB (446 words) - 04:14, 4 December 2015
  • ...drive team, with a special fedoras-off to first-time driver Abbi and first-time human player Kevin! Also, thanks to Ian for stepping up to the challenging ...<sup>nd</sup> annual MAR Team Day. Absolutely perfect weather and a great time had by all!
    12 KB (1,900 words) - 11:19, 28 December 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (381 words) - 02:33, 13 December 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    3 KB (413 words) - 04:06, 6 January 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...he workshop for most of the meeting repairing the treads that we made last time that did not work. Justin At the last hour of the meeting Went to the progr
    3 KB (485 words) - 21:38, 23 December 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    1 KB (204 words) - 21:39, 23 December 2015
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    3 KB (416 words) - 04:27, 8 January 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    1 KB (187 words) - 21:04, 2 January 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (363 words) - 04:37, 8 January 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    4 KB (642 words) - 01:18, 3 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    904 bytes (118 words) - 12:39, 27 January 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees :-At any time, all of these may be turned on. We needed a way to allow for different feat
    3 KB (534 words) - 17:00, 28 January 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (247 words) - 16:35, 27 January 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    4 KB (713 words) - 16:34, 27 January 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (322 words) - 17:11, 27 January 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees -We completed a point analysis based off the predicted time it would take to complete various tasks.
    3 KB (515 words) - 17:51, 27 January 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...allowed for more flexibility when two projects were completed at the same time.
    4 KB (673 words) - 01:27, 3 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (384 words) - 00:54, 3 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (313 words) - 17:09, 28 January 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    3 KB (473 words) - 19:13, 28 January 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (240 words) - 18:57, 28 January 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    5 KB (759 words) - 20:06, 28 January 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    3 KB (493 words) - 20:15, 28 January 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (228 words) - 18:57, 16 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (366 words) - 19:00, 16 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (257 words) - 19:07, 16 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (274 words) - 19:11, 16 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    1 KB (169 words) - 19:17, 16 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    1 KB (222 words) - 19:20, 16 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    1 KB (180 words) - 16:46, 8 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    1 KB (159 words) - 20:37, 15 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees Tested the SuperGrip belts on Deux. First time these were installed. Also our first belt change. SuperGrip surface great
    3 KB (473 words) - 19:22, 16 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (308 words) - 19:23, 16 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    726 bytes (99 words) - 20:38, 15 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    912 bytes (131 words) - 19:25, 16 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    1 KB (192 words) - 19:26, 16 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    1 KB (185 words) - 21:35, 16 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    1,009 bytes (143 words) - 01:39, 15 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    1 KB (192 words) - 19:28, 16 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    703 bytes (96 words) - 20:53, 20 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    896 bytes (126 words) - 20:52, 20 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    759 bytes (105 words) - 20:49, 20 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    856 bytes (124 words) - 23:45, 22 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    789 bytes (112 words) - 23:41, 22 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    764 bytes (107 words) - 22:44, 23 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    724 bytes (101 words) - 17:57, 27 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (328 words) - 20:33, 15 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    2 KB (261 words) - 19:55, 28 January 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    1 KB (199 words) - 21:55, 30 January 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    1 KB (216 words) - 19:18, 13 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    1 KB (149 words) - 20:28, 14 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees ...age for our planned video to be used at our next competition. At the same time we were able to run lots on autonomous runs.
    5 KB (708 words) - 01:51, 19 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Attendees
    654 bytes (90 words) - 19:40, 13 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance:
    1 KB (188 words) - 23:42, 17 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance: ...e needed lots of drivers practice. FRC build season has taken away lots of time, so it was imperative that we get at least a few nights of driver's practic
    3 KB (452 words) - 01:55, 19 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance: ...re two loads in the mid zone, and one in the high. If we don't have enough time to score in the mid twice, we will go straight to the high zone.
    3 KB (425 words) - 02:12, 19 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance:
    1 KB (197 words) - 02:29, 24 February 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance:
    3 KB (479 words) - 19:18, 16 March 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance:
    3 KB (462 words) - 23:40, 16 March 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance:
    3 KB (475 words) - 22:22, 16 March 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance:
    2 KB (299 words) - 22:47, 16 March 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance:
    2 KB (260 words) - 23:06, 16 March 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance:
    1 KB (190 words) - 23:29, 16 March 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance:
    883 bytes (125 words) - 22:56, 15 March 2016
  • ...t the Westtown School) and 1640 and was a huge success. This was the first time the two teams had worked together to host a robotics tournament. According
    6 KB (853 words) - 15:48, 14 May 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance: ...intake, figure out a hang, and train the scouts. We have dedicated a whole time to driver's practice, which was clearly lacking at Supers.
    2 KB (335 words) - 23:32, 14 April 2016
  • For the first time, FRC 1640 participated in Steel City Showdown, 5-August at Carnagie Univers
    5 KB (769 words) - 01:25, 7 August 2023
  • ...d by West Mountain Radio). The CBA measures the voltage of a battery over time under a fixed current load until a set terminal voltage is reached. For th ...st with the CBA III was conducted in March 2014. These test are labor and time intensive. Since then, we have relied on the Battery Beak to assess batter
    8 KB (1,316 words) - 14:28, 26 September 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance:
    1,023 bytes (156 words) - 22:41, 24 April 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance:
    3 KB (391 words) - 22:58, 24 April 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance:
    1 KB (194 words) - 22:50, 24 April 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance:
    2 KB (265 words) - 23:05, 24 April 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance:
    1 KB (229 words) - 23:11, 24 April 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance: ...ch. The pit team will prepare the robot for the next scheduled match when time appropriate. Drive team and pit crew will manage the battery charging of p
    2 KB (298 words) - 01:14, 25 April 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance:
    2 KB (300 words) - 01:25, 25 April 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance: ...Trevor are practicing to drive the robot. The team is having Matt to keep time of the 30 second Autonomous and the 2:00 Tele-op period including the 30 se
    2 KB (236 words) - 02:30, 25 April 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance:
    1 KB (235 words) - 02:33, 25 April 2016
  • !Meeting Date !!Meeting Time !!Location !!Team Members in Attendance:
    2 KB (307 words) - 02:36, 25 April 2016
  • ...as it freed the Mill for form on larger parts. In the past, a lot of Mill time was used to produce gussets and other small plate parts, or we accepted saw
    5 KB (764 words) - 22:58, 13 May 2016
  • *We always queued in time, but sometimes without full repairs being made.
    2 KB (381 words) - 11:35, 9 May 2016
  • * Everyone got sick and threw up (but not all at the same time) * Excessive time was lost in tracked drive-train development
    3 KB (386 words) - 20:12, 14 May 2016
  • Nineteen middle school girls had an awesome time at TCHS Saturday afternoon; learning how to program robots!
    4 KB (530 words) - 18:26, 14 December 2016
  • ...Westtown. Welds broke and had to be patched. Sprockets came off. It was time for a new intake after Westtown. Intake #1 was based on a weldment compris
    5 KB (741 words) - 16:52, 27 November 2016
  • ...starting 2010. Last year, we were selected for eliminations for the first time and ended up as Finalists!
    3 KB (454 words) - 21:13, 25 July 2016
  • We spent a lot of time on the practice field during IRI 2016. Nothing wrong with that. I think it is time for the next version of our intake.
    2 KB (272 words) - 20:59, 18 July 2016
  • ...2. The decision was made not to compete at Hatboro-Horsham (for the first time since going to the District model). We will compete at Westtown and Seneca
    758 bytes (112 words) - 17:26, 6 October 2016
  • ...sting them and keeping records. Earlier batteries still in service at the time were included in this identification system. ...d by West Mountain Radio). The CBA measures the voltage of a battery over time under a fixed current load until a set terminal voltage is reached. For th
    10 KB (1,686 words) - 11:50, 22 April 2019
  • ...in 2008 (with a [[DEWBOT IV Duel on the Delaware | terrible robot]]) and 4-time winners in [[DEWBOT VII Duel on the Delaware | 2011]], [[DEWBOT VIII Duel o
    4 KB (634 words) - 10:30, 22 October 2017
  • * We received the District Engineering Inspiration Awards for the first time - [[DEWBOT XIII Seneca | Seneca]] ...will end up spinning. If all three robots don't climb, you've got a tough time winning. So scores of 305 (3-rotors; one in auton) and 345 (445 in elims -
    8 KB (1,150 words) - 11:14, 20 March 2018
  • ...ial networking issues, we got it working. We did not, however, have enough time to start collecting data. We will continue tomorrow.
    4 KB (560 words) - 20:26, 21 January 2017
  • ...ension, since the width is just long enough for 3 balls to go at the same time and get stuck, clogging the entire mechanism. We tried to fix the problem o
    2 KB (365 words) - 17:56, 5 February 2017
  • *Shooter tested with (2) 775Pro motors - recovery time reduced to 0.2 sec.
    924 bytes (117 words) - 14:20, 5 February 2017
  • # Reliability - The climb needs to work every time The above gearing was consistently reliable, but time from rope contact to light on is 8±1 second. Faster would be better.
    5 KB (802 words) - 16:07, 7 May 2017
  • ...reduces the magnitude of speed reduction while shooting, but not recovery time * More power reduces speed recovery time
    4 KB (627 words) - 10:30, 11 May 2017
  • For the first time, the team received the Engineering Inspiration Award.
    2 KB (377 words) - 23:28, 11 April 2017
  • ...170425-1.jpg|FRC Championship at St. Louis's America Center - for the last time...
    8 KB (1,320 words) - 15:06, 5 May 2017
  • image:DB13_MM_170617-31.jpg|Time to invite the 3<sup>rd</sup> partner...
    4 KB (662 words) - 23:56, 21 June 2017
  • 1. Maximum Area or time for cutting mission?
    5 KB (808 words) - 00:21, 9 June 2018
  • Great food and a Karaoke contest! Everyone had a wonderful time.
    1 KB (159 words) - 10:02, 26 June 2017
  • * We received the District Chairman's Award for the first time - [[DEWBOT XIV Hatboro-Horsham | Hatboro-Horsham]] :For the first time ever, Team Sab-BOT-age received the District Chairman's Award! This is a s
    11 KB (1,563 words) - 14:40, 6 November 2018
  • Fourteen middle school girls had an awesome time at TCHS Saturday afternoon; learning how to program robots!
    3 KB (438 words) - 23:20, 23 September 2017
  • ...in 2008 (with a [[DEWBOT IV Duel on the Delaware | terrible robot]]) and 5-time winners in [[DEWBOT VII Duel on the Delaware | 2011]], [[DEWBOT VIII Duel o
    4 KB (605 words) - 19:31, 22 October 2017
  • ...planet carrier and the output shaft. This backlash tends to increase over time.
    6 KB (953 words) - 23:43, 28 March 2018
  • * Lift time from pick-up to scale scoring ~ 1 sec
    10 KB (1,619 words) - 15:48, 5 August 2018
  • For the first time ever, Team Sab-BOT-age received the District Chairman's Award! This is a s :''For over 10 years this mentor has selflessly dedicated his time to his team and FIRST. As the go to guy on his team, he is always there to
    6 KB (886 words) - 18:10, 8 April 2018
  • Image:DB14_MAR_Championship_180407-62.jpg|It's time to hang up this hat for a while...
    5 KB (745 words) - 15:51, 8 April 2018
  • ...d the Excellence in Engineering Award for Carson-Tesla. This is the first time that the team has won an award (other than Winner or Finalist) at FRC Champ
    8 KB (1,238 words) - 12:54, 14 March 2024
  • :For the first time, we will not go to kickoff as a team. Reason is: 1) no field pieces; and 2
    10 KB (1,413 words) - 13:30, 12 December 2019
  • :At this this time, we have not yet evaluated options regarding what we may do to keep the rob image:DB14_Exton_180718-1.jpg|First time using painted whiteboard
    10 KB (1,620 words) - 17:32, 29 November 2019
  • Fifteen middle school girls had an awesome time at Exton Square Mall Saturday afternoon; learning how to program robots!
    3 KB (425 words) - 12:33, 16 September 2018
  • Braden served for the 1<sup>st</sup> time as pit captain. The balance of the pit crew comprised:
    6 KB (938 words) - 23:30, 8 October 2018
  • ...in 2008 (with a [[DEWBOT IV Duel on the Delaware | terrible robot]]) and 5-time winners in [[DEWBOT VII Duel on the Delaware | 2011]], [[DEWBOT VIII Duel o Vinny served for the first time as Lead Scout.
    5 KB (817 words) - 23:32, 21 October 2018
  • Vinny served for the first time as Lead Scout. He did a great job! Ella and Sai alternated as Operator. Ella for the first time (Sai was at HAVOC).
    13 KB (1,918 words) - 21:46, 4 January 2019
  • Real-time competition scores were available via wi-fi in the Judges' Deliberation Roo
    6 KB (860 words) - 01:12, 10 December 2018
  • For the first time, FRC 1640 participated in Summer Heat, held at Falmouth High School, Maine
    2 KB (337 words) - 17:22, 29 July 2023
  • This is the first time Sab-BOT-age has won two District Qualifiers in one season.
    5 KB (840 words) - 16:24, 26 March 2019
  • * It needs to be ''fast''! <1 sec transit time from bottom to top positions
    1 KB (183 words) - 02:53, 29 March 2019
  • image:DB15_D-Town_Dustoff_191123-49.jpg|Matches are over - time to clean up for Awards!
    8 KB (1,093 words) - 21:48, 27 November 2019
  • image:FLL_RQT_191214-33.jpg|Lunch time in the volunteer lounge
    9 KB (1,472 words) - 01:16, 18 December 2019
  • ...e, It's 2021 virtual recycle, and the COVID-21 interregnum. For the first time in team history, one robot was used for two years.
    5 KB (698 words) - 13:05, 10 March 2022
  • image:DB15_RCC_190803-33.jpg|DEWBOT plays defense! (first time ever)
    10 KB (1,576 words) - 22:42, 29 November 2019
  • ...in 2008 (with a [[DEWBOT IV Duel on the Delaware | terrible robot]]) and 5-time winners in [[DEWBOT VII Duel on the Delaware | 2011]], [[DEWBOT VIII Duel o
    7 KB (1,119 words) - 12:23, 25 October 2019
  • ...in July (July 28)?"''. This was an exciting opportunity, but also a short time horizon. When I brought this to the team's mentors and parents I expected: ...onic or pneumatic systems. They were a great team to work with and by the time our three days together had passed, we had a (barely) complete but untested
    11 KB (1,742 words) - 14:11, 19 December 2019
  • ...llion of the 1860s, losing commercial dominance to nearby Shanghai at this time.
    5 KB (847 words) - 17:15, 1 December 2019
  • image:DB16_Build_20200222-19.jpg|Time for Dinner!
    6 KB (862 words) - 15:08, 23 February 2020
  • ...ficant advantage of not backdriving under load without power. At the same time, they are easily driven by hand in order to facilitate easy and safe remova ...- Logomotion), primarily for electronics panels. This is really the first time that carbon fiber was used specifically for structural purposes and specifi
    8 KB (1,167 words) - 20:09, 16 March 2020
  • # it was perceived that this would not be a difficult or expensive (in mind-time, weight, motors, etc.) capability to include.
    4 KB (633 words) - 12:31, 27 February 2020
  • * For the 10<sup>th</sup> consecutive time (recognizing that the 2020 and 2021 FRC Championships were cancelled due to
    6 KB (896 words) - 05:55, 15 February 2023
  • #) For the first time, the steering angle is measured directly rather than by proxy. ...with the magnet also coaxial with the rotational axis. So, for the first time ever, we are actually measuring the angle of the steering directly rather t
    5 KB (755 words) - 19:37, 22 March 2022
  • image:DB17_SCH_20220320-17.jpg|Time for the 1<sup>st</sup> Alliance's 2<sup>nd</sup> pick
    9 KB (1,394 words) - 11:49, 23 March 2022
  • So this year, for the first time ever, team Sab-BOT-age had to go through a make-versus-buy analysis. Using ...ional and better-fitting bores in these gears and represents a significant time and cost savings.
    6 KB (894 words) - 00:04, 1 March 2023
  • ...in 2008 (with a [[DEWBOT IV Duel on the Delaware | terrible robot]]) and 5-time winners in [[DEWBOT VII Duel on the Delaware | 2011]], [[DEWBOT VIII Duel o
    2 KB (291 words) - 12:20, 15 February 2023
  • A ROBOT may only possess one (1) Game Piece at a time.
    5 KB (893 words) - 02:32, 26 February 2023

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)