Difference between revisions of "Steering Committee 2011-11-17"

From DEW Robotics
Jump to: navigation, search
(draft notes)
Line 1: Line 1:
 
17-November-2011 - 6:15 - 8:00 pm - Creamery Way warehouse<br><br>
 
17-November-2011 - 6:15 - 8:00 pm - Creamery Way warehouse<br><br>
  
Attendance: Faith, Clem, Foster, Scott, Gary, Rizzo, Rita, Siri (notes)
+
Attendance: C. McKown, F. McKown, F. Schucker, S. Featherman, G. Deaver, M. Rizzo, S. Maley (notes)
 
<br><br>
 
<br><br>
 
Last Minutes approved
 
Last Minutes approved
Line 8: Line 8:
 
*$2,006.54 Checking
 
*$2,006.54 Checking
 
*$6,749.12 Savings
 
*$6,749.12 Savings
*$1,422 FLL
+
*$1,422 of that for FLL
*$7,333.33 FRC
+
*$7,333.33 of that for FRC
  
 
FRC Breakdown
 
FRC Breakdown
Line 18: Line 18:
 
*UTC – turned in
 
*UTC – turned in
 
*Sikorsky contact via Rita – want to sponsor, has mentor program with potential mentor, alumni program
 
*Sikorsky contact via Rita – want to sponsor, has mentor program with potential mentor, alumni program
 +
*Buying $150 in sensors ($15/ea, max 10)
 +
*Paying $750 in insurance via STEMRobotics
  
 
VEX Breakdown
 
VEX Breakdown
Line 44: Line 46:
 
*Julie’s letter is out, but no response yet (not expected at this point)
 
*Julie’s letter is out, but no response yet (not expected at this point)
 
*Very early possibility of space from Sikorsky via Rita
 
*Very early possibility of space from Sikorsky via Rita
 +
*Clem writing letter to the editor
 +
  
 
FLL
 
FLL
 
*5-6 at Springton Manner
 
*5-6 at Springton Manner
 
*~40 total
 
*~40 total
 +
  
 
FRC Schedule
 
FRC Schedule

Revision as of 00:59, 18 November 2011

17-November-2011 - 6:15 - 8:00 pm - Creamery Way warehouse

Attendance: C. McKown, F. McKown, F. Schucker, S. Featherman, G. Deaver, M. Rizzo, S. Maley (notes)

Last Minutes approved

Finance

  • $2,006.54 Checking
  • $6,749.12 Savings
  • $1,422 of that for FLL
  • $7,333.33 of that for FRC

FRC Breakdown

  • $500 from ASME
  • $2,000 Arkema
  • Boeing – turned in, looking for entrance fee due 12/2
  • Lockheed – turned in
  • UTC – turned in
  • Sikorsky contact via Rita – want to sponsor, has mentor program with potential mentor, alumni program
  • Buying $150 in sensors ($15/ea, max 10)
  • Paying $750 in insurance via STEMRobotics

VEX Breakdown

  • + $16,895 – dues, donations
  • - $8,375 parts
  • - $1,500 event fee
  • $4,000 short of operating budget


Light Bulbs

  • Originals Sold: 16 this month, 75 total, 44 left. Buy $7.50 & sell $15
  • TNGs: 800W dimmable, buy $18 & sell $26. 24/case
  • Can’t buy originals anymore
  • Will buy 1 case of TNGs

Space

  • Creamery still up in the air
  • If current contract falls through (likely but not certain), we’ll likely be here
  • Only have the 30 days officially

Moving

  • Get stuff out of Ben’s warehouse
  • Clem talking with Fiore on Friday 18 Nov 2011
  • STEM is aware of build season deadline
  • CCIU will not have space until summer
  • Julie’s letter is out, but no response yet (not expected at this point)
  • Very early possibility of space from Sikorsky via Rita
  • Clem writing letter to the editor


FLL

  • 5-6 at Springton Manner
  • ~40 total


FRC Schedule

  • 2 demos (STEM & East) 18 Nov 11
  • 2 regular meetings left
  • 14 Dec: Parent + Student meeting, then Mentor meeting

FRC Non-Technical Projects

  • Award preparation: behind in safety video (low focus), Dean’s List in the works, Chairman’s behind, WFA needs some work
  • Media meeting plan: need to encourage full concept (mentors conflict of interest)
  • We need more diverse recruiting – via students
  • Let’s not waste time or force students – let the kids do what they’re interested in (find out)
  • Chairman’s is currently dead for the year – may be revived by someone passionate
  • Same for animation, possibly revived for second video


VEX Schedule

  • Event 10 Dec
  • Last meeting 14 Dec
  • Scrimmage @ PSU Abington on 3 Dec – need judges mentors of veteran FRC students
  • Need to plan trip to Disney: 1 “team” pre-qualified
  • Late start progress: 5 drive + manipulator runningish, 7 almost working drives + planned manipulators, 4 behind
  • FLL also running behind – all due to space issues. Need to start Labor Day Tuesday.