Difference between revisions of "Stronghold Meeting - 18-Jan-2016"
From DEW Robotics
MaiKangWei (talk | contribs) |
Aweissman7 (talk | contribs) |
||
Line 13: | Line 13: | ||
|} | |} | ||
==CAD & Design== | ==CAD & Design== | ||
− | + | ||
+ | -Intake Crayola CAD continues. We should have it ready within the next couple of days. | ||
==Mechanical== | ==Mechanical== | ||
+ | |||
+ | -An adjustable launch angle catapult was developed from the original prototype, allowing for more accurate testing. | ||
==Programming== | ==Programming== |
Revision as of 16:52, 28 January 2016
Contents
Competition Season Meeting
Meeting Date | Meeting Time | Location | Attendees |
---|---|---|---|
TCHS Brandywine |
CAD & Design
-Intake Crayola CAD continues. We should have it ready within the next couple of days.
Mechanical
-An adjustable launch angle catapult was developed from the original prototype, allowing for more accurate testing.
Programming
- We started with investigating the memory problem of GRIP.
- -Fist, we watched to see if there was a memory leak. It did not appear to be so. If there was one, it was unnoticeable.
- -We deployed the GRIP program, watching the RAM before and after. The GRIP program used almost 50 mb of RAM.
- -For now, it seems that GRIP only causes memory issues occasionally during deploys.
- -Since this did not cause a serious problem, we decided to wait for a GRIP update to address this issue.
Strategy
Field Elements
Other
Recorded by: | Date: | Journal Editor: | Date: |
---|---|---|---|