Difference between revisions of "Stronghold Meeting - 18-Jan-2016"

From DEW Robotics
Jump to: navigation, search
Line 13: Line 13:
 
|}
 
|}
 
==CAD & Design==
 
==CAD & Design==
No CAD meeting
+
 
 +
-Intake Crayola CAD continues. We should have it ready within the next couple of days.
  
 
==Mechanical==
 
==Mechanical==
 +
 +
-An adjustable launch angle catapult was developed from the original prototype, allowing for more accurate testing.
  
 
==Programming==
 
==Programming==

Revision as of 16:52, 28 January 2016

<< PREVIOUS -- NEXT>>

Competition Season Meeting

Meeting Date Meeting Time Location Attendees
TCHS Brandywine

CAD & Design

-Intake Crayola CAD continues. We should have it ready within the next couple of days.

Mechanical

-An adjustable launch angle catapult was developed from the original prototype, allowing for more accurate testing.

Programming

- We started with investigating the memory problem of GRIP.

-Fist, we watched to see if there was a memory leak. It did not appear to be so. If there was one, it was unnoticeable.
-We deployed the GRIP program, watching the RAM before and after. The GRIP program used almost 50 mb of RAM.
-For now, it seems that GRIP only causes memory issues occasionally during deploys.
-Since this did not cause a serious problem, we decided to wait for a GRIP update to address this issue.

Strategy

Field Elements

Other



Recorded by: Date: Journal Editor: Date:








<< PREVIOUS -- NEXT>>