Difference between revisions of "Stronghold Meeting - 21-Jan-2016"
From DEW Robotics
Aweissman7 (talk | contribs) |
(→Programming) |
||
Line 23: | Line 23: | ||
==Programming== | ==Programming== | ||
+ | |||
+ | -The raspberry pi arrived today! | ||
+ | |||
+ | :- We loaded the raspian operating system onto the raspberry pi. | ||
+ | |||
+ | :- After transferring the correct files onto the pi, we attempted to run the grip program. Some dependency exceptions were thrown. | ||
==Strategy== | ==Strategy== |
Latest revision as of 19:55, 28 January 2016
Contents
Competition Season Meeting
Meeting Date | Meeting Time | Location | Attendees |
---|---|---|---|
TCHS Brandywine |
CAD & Design
-Scaling Crayola CAD were completed, and it looks like we will be deciding on an order of hanging for our matches.
Mechanical
-The AM14U2 kitbot is complete! It was able to drive over all Category B and D defenses, but not as nicely as necessary. The moat proved to be especially challenging and, while it is able to climb over it, it did struggle quite a bit. Did it struggle too much to keep it as a contender?
-The catapult was tested with the actual tower and was able to score, but it broke its hard stop. a new one made of steel was welded together.
Programming
-The raspberry pi arrived today!
- - We loaded the raspian operating system onto the raspberry pi.
- - After transferring the correct files onto the pi, we attempted to run the grip program. Some dependency exceptions were thrown.
Strategy
Field Elements
Other
Recorded by: | Date: | Journal Editor: | Date: |
---|---|---|---|