Stronghold Meeting - 27-Jan-2016
From DEW Robotics
Contents
Competition Season Meeting
Meeting Date | Meeting Time | Location | Attendees |
---|---|---|---|
TCHS Brandywine |
CAD & Design
Continued work on chassis, design almost finalized, also prototyped intake arms
Mounting plate for tracked drive assembly ( pdf)
Axle for large track idler pulley ( pdf)
Axle for small track idler pulley ( pdf)
Mechanical
Pulleys and belts arrived. Also 6061 Al for the track drive plates.
work started on cutting drive axles and the drive mounting plates (based on drawings above).
Programming
Strategy
Field Elements
Other
Recorded by: | Date: | Journal Editor: | Date: |
---|---|---|---|