Difference between revisions of "DEWBOT VII Design Team Page"

From DEW Robotics
Jump to: navigation, search
(Pivot Drive Value Engineering - 22-November-2010)
(Wooden Man - 28-November-2010)
Line 21: Line 21:
 
==Wooden Man - 28-November-2010==
 
==Wooden Man - 28-November-2010==
 
:Based on feedback to the "Straw man" proposal on 22-November, an improved [[media:1640_Pivot_Drive_Wooden_Man_101128.pdf | "Wooden Man" (pdf)]] design was developed to elicit further critique.
 
:Based on feedback to the "Straw man" proposal on 22-November, an improved [[media:1640_Pivot_Drive_Wooden_Man_101128.pdf | "Wooden Man" (pdf)]] design was developed to elicit further critique.
 +
 +
==Scoring Models - 11-January-2011==
 +
Siri
  
 
----
 
----
 
[[Category:DEWBOT VII]]
 
[[Category:DEWBOT VII]]

Revision as of 01:16, 12 January 2011

Head Mentor: Clem McKown

Student Lead: Sasha

Team:

Carly
Andrew
Douglas
Molly
Scott Featherman
Gary Deaver
David Moyer
Ben Kellom
Siri Maley

Pivot Drive Value Engineering - 22-November-2010

Ran a Value Engineering session on the 2010 Pivot Drive.
Value Engineering Slides (ppt) including "Straw Man" proposal for modular Pivot Unit.

Wooden Man - 28-November-2010

Based on feedback to the "Straw man" proposal on 22-November, an improved "Wooden Man" (pdf) design was developed to elicit further critique.

Scoring Models - 11-January-2011

Siri