Difference between revisions of "DEWBOT VII Design Team Page"
From DEW Robotics
MaiKangWei (talk | contribs) (→Pivot Drive Value Engineering - 22-November-2010) |
MaiKangWei (talk | contribs) (→Wooden Man - 28-November-2010) |
||
Line 21: | Line 21: | ||
==Wooden Man - 28-November-2010== | ==Wooden Man - 28-November-2010== | ||
:Based on feedback to the "Straw man" proposal on 22-November, an improved [[media:1640_Pivot_Drive_Wooden_Man_101128.pdf | "Wooden Man" (pdf)]] design was developed to elicit further critique. | :Based on feedback to the "Straw man" proposal on 22-November, an improved [[media:1640_Pivot_Drive_Wooden_Man_101128.pdf | "Wooden Man" (pdf)]] design was developed to elicit further critique. | ||
+ | |||
+ | ==Scoring Models - 11-January-2011== | ||
+ | Siri | ||
---- | ---- | ||
[[Category:DEWBOT VII]] | [[Category:DEWBOT VII]] |
Revision as of 01:16, 12 January 2011
Head Mentor: Clem McKown
Student Lead: Sasha
Team:
- Carly
- Andrew
- Douglas
- Molly
- Scott Featherman
- Gary Deaver
- David Moyer
- Ben Kellom
- Siri Maley
Pivot Drive Value Engineering - 22-November-2010
- Ran a Value Engineering session on the 2010 Pivot Drive.
- Value Engineering Slides (ppt) including "Straw Man" proposal for modular Pivot Unit.
Wooden Man - 28-November-2010
- Based on feedback to the "Straw man" proposal on 22-November, an improved "Wooden Man" (pdf) design was developed to elicit further critique.
Scoring Models - 11-January-2011
Siri