Difference between revisions of "DEWBOT VII Design Team Page"
From DEW Robotics
MaiKangWei (talk | contribs) (→Wooden Man - 28-November-2010) |
(→Scoring Models - 11-January-2011: details) |
||
Line 23: | Line 23: | ||
==Scoring Models - 11-January-2011== | ==Scoring Models - 11-January-2011== | ||
− | Siri | + | Siri made an [[Media:LogoMotion Scoring.xls | Excel interface]] that tallies individual and overall autonomous score, raw peg, uber-multiplied and logo bonus scores, race scores, and penalties into an overall match score. |
− | |||
---- | ---- | ||
[[Category:DEWBOT VII]] | [[Category:DEWBOT VII]] |
Revision as of 02:38, 12 January 2011
Head Mentor: Clem McKown
Student Lead: Sasha
Team:
- Carly
- Andrew
- Douglas
- Molly
- Scott Featherman
- Gary Deaver
- David Moyer
- Ben Kellom
- Siri Maley
Pivot Drive Value Engineering - 22-November-2010
- Ran a Value Engineering session on the 2010 Pivot Drive.
- Value Engineering Slides (ppt) including "Straw Man" proposal for modular Pivot Unit.
Wooden Man - 28-November-2010
- Based on feedback to the "Straw man" proposal on 22-November, an improved "Wooden Man" (pdf) design was developed to elicit further critique.
Scoring Models - 11-January-2011
Siri made an Excel interface that tallies individual and overall autonomous score, raw peg, uber-multiplied and logo bonus scores, race scores, and penalties into an overall match score.