Difference between revisions of "DEWBOT VII Design Team Page"

From DEW Robotics
Jump to: navigation, search
(Wooden Man - 28-November-2010)
(Scoring Models - 11-January-2011: details)
Line 23: Line 23:
  
 
==Scoring Models - 11-January-2011==
 
==Scoring Models - 11-January-2011==
Siri  
+
Siri made an [[Media:LogoMotion Scoring.xls | Excel interface]] that tallies individual and overall autonomous score, raw peg, uber-multiplied and logo bonus scores, race scores, and penalties into an overall match score.
 
 
 
----
 
----
 
[[Category:DEWBOT VII]]
 
[[Category:DEWBOT VII]]

Revision as of 02:38, 12 January 2011

Head Mentor: Clem McKown

Student Lead: Sasha

Team:

Carly
Andrew
Douglas
Molly
Scott Featherman
Gary Deaver
David Moyer
Ben Kellom
Siri Maley

Pivot Drive Value Engineering - 22-November-2010

Ran a Value Engineering session on the 2010 Pivot Drive.
Value Engineering Slides (ppt) including "Straw Man" proposal for modular Pivot Unit.

Wooden Man - 28-November-2010

Based on feedback to the "Straw man" proposal on 22-November, an improved "Wooden Man" (pdf) design was developed to elicit further critique.

Scoring Models - 11-January-2011

Siri made an Excel interface that tallies individual and overall autonomous score, raw peg, uber-multiplied and logo bonus scores, race scores, and penalties into an overall match score.