Difference between revisions of "DEWBOT VII Minibot Deployment"

From DEW Robotics
Jump to: navigation, search
(Scissors)
(Scissors)
Line 2: Line 2:
  
 
==Scissors==
 
==Scissors==
 +
 +
:Initial concept for deploying the Minibot and applied to the V-bot.
 +
 +
:Assembled for testing only on 20-February.  Manual deployment tests indicated that this deployment method would not be reliable.  Additional issues with off-axis deployment of the one or two 3/4" bore, 5" stroke pneumatic cylinders were unresolved. 
  
 
<gallery widths=250 heights=250 perrow=3>
 
<gallery widths=250 heights=250 perrow=3>
Line 7: Line 11:
 
image:DB7_Davis_V-bot_110220_csm.jpg|Jon Davis placing V-bot on scissors for test
 
image:DB7_Davis_V-bot_110220_csm.jpg|Jon Davis placing V-bot on scissors for test
 
image:DB7_deploy_test_110220_csm_1.jpg|Test deployment 1/5
 
image:DB7_deploy_test_110220_csm_1.jpg|Test deployment 1/5
image:DB7_deploy_test_110220_csm_2.jpg|Test deployment 2/5
 
 
image:DB7_deploy_test_110220_csm_3.jpg|Test deployment 3/5
 
image:DB7_deploy_test_110220_csm_3.jpg|Test deployment 3/5
 
image:DB7_deploy_test_110220_csm_4.jpg|Test deployment 4/5
 
image:DB7_deploy_test_110220_csm_4.jpg|Test deployment 4/5

Revision as of 22:42, 21 March 2011

Analysis of Minibot deployment considerations and concepts. Updated 23 Jan 2011, Siri.

Scissors

Initial concept for deploying the Minibot and applied to the V-bot.
Assembled for testing only on 20-February. Manual deployment tests indicated that this deployment method would not be reliable. Additional issues with off-axis deployment of the one or two 3/4" bore, 5" stroke pneumatic cylinders were unresolved.

Bident Forwards

Bident Aft (Fanger