Difference between revisions of "DEWBOT VII Minibot Deployment"
From DEW Robotics
MaiKangWei (talk | contribs) (→Scissors) |
MaiKangWei (talk | contribs) (→Scissors) |
||
Line 2: | Line 2: | ||
==Scissors== | ==Scissors== | ||
+ | |||
+ | :Initial concept for deploying the Minibot and applied to the V-bot. | ||
+ | |||
+ | :Assembled for testing only on 20-February. Manual deployment tests indicated that this deployment method would not be reliable. Additional issues with off-axis deployment of the one or two 3/4" bore, 5" stroke pneumatic cylinders were unresolved. | ||
<gallery widths=250 heights=250 perrow=3> | <gallery widths=250 heights=250 perrow=3> | ||
Line 7: | Line 11: | ||
image:DB7_Davis_V-bot_110220_csm.jpg|Jon Davis placing V-bot on scissors for test | image:DB7_Davis_V-bot_110220_csm.jpg|Jon Davis placing V-bot on scissors for test | ||
image:DB7_deploy_test_110220_csm_1.jpg|Test deployment 1/5 | image:DB7_deploy_test_110220_csm_1.jpg|Test deployment 1/5 | ||
− | |||
image:DB7_deploy_test_110220_csm_3.jpg|Test deployment 3/5 | image:DB7_deploy_test_110220_csm_3.jpg|Test deployment 3/5 | ||
image:DB7_deploy_test_110220_csm_4.jpg|Test deployment 4/5 | image:DB7_deploy_test_110220_csm_4.jpg|Test deployment 4/5 |
Revision as of 22:42, 21 March 2011
Analysis of Minibot deployment considerations and concepts. Updated 23 Jan 2011, Siri.
Scissors
- Initial concept for deploying the Minibot and applied to the V-bot.
- Assembled for testing only on 20-February. Manual deployment tests indicated that this deployment method would not be reliable. Additional issues with off-axis deployment of the one or two 3/4" bore, 5" stroke pneumatic cylinders were unresolved.
Bident Forwards
Bident Aft (Fanger
- DB7 baby on board 110319 csm.jpg
Post-FLR deployment (in development)