Difference between revisions of "DEWBOT V Build"

From DEW Robotics
Jump to: navigation, search
Line 57: Line 57:
 
;[[DEWBOT V Week Three Build Season Photo Gallery|Week Three Photo Gallery]]
 
;[[DEWBOT V Week Three Build Season Photo Gallery|Week Three Photo Gallery]]
  
<gallery widths=250 heights=250>
 
File:DB5_frame_welding_090118_csm_1.jpg|Rear frame on form
 
File:DB5_frame_welding_090118_csm_2.jpg|
 
File:DB5_frame_welding_090118_csm_3.jpg|Frame assembled on form
 
File:DB5_Maley_frame_welding_090118_csm_1.jpg|Siri Maley welding Dewbot V's frame
 
File:DB5_Maley_frame_welding_090118_csm_2.jpg|Siri Maley welding Dewbot V's frame
 
File:DB5_Maley_frame_welding_090118_csm_3.jpg
 
File:DB5_Maley_frame_welding_090118_csm_4.jpg
 
File:DB5_trailer_bumpers_090118_csm.jpg|Lunacy trailer bumper assembly
 
File:DB5_Maley_grinding_frame_090118_csm.jpg|Siri Maley grinding welds on Dewbot V's frame
 
File:DB5_frame_weigh-in_090118_csm.jpg|Weigh-in for frame weldment - 10.5 lb - exactly on prediction
 
File:DB5_Davis_hopper_proto_090118_csm_1.jpg|Jon Davis assembles hopper prototype
 
File:DB5_Davis_Schucker_hopper_test_090118_csm.jpg|Foster Schucker watches as Jon Davis tests hopper prototype
 
File:DB5_gearbox_090124_csm.jpg|Dewbot V custom gearbox
 
File:DB5_gearbox_mass_090124_csm.jpg|gearbox & CIM mass
 
File:DB5_McKown_090124_csm.jpg|Heather McKown
 
File:DB5_McKown_breaking_chain_090124_csm.jpg|Carly McKown breaking chain
 
</gallery>
 
  
 
===Week Four - Hopper Fabrication (1/25-1/31)===
 
===Week Four - Hopper Fabrication (1/25-1/31)===
Line 88: Line 70:
 
*Bent and welded outer hopper spiral
 
*Bent and welded outer hopper spiral
  
====Week Four Photo Gallery====
+
;[[DEWBOT V Week Four Build Season Photo Gallery|Week Four Photo Gallery]]
  
 
<gallery widths=250 heights=250>
 
<gallery widths=250 heights=250>
Line 119: Line 101:
 
File:DB5_Rizzo_Featherman_090129_csm.jpg|Mike Rizzo & Jarryd Featherman
 
File:DB5_Rizzo_Featherman_090129_csm.jpg|Mike Rizzo & Jarryd Featherman
 
File:DB5_7th_wheel_090130_csm_1.jpg|7th wheel in assembly
 
File:DB5_7th_wheel_090130_csm_1.jpg|7th wheel in assembly
File:DB5_7th_wheel_090130_csm_1.jpg
+
File:DB5_7th_wheel_090130_csm_2.jpg
File:DB5_second_drive_090130_csm_1.jpg|Dewbot V's second drive (pulling trailer)
+
File:DB5_second_drive_090130_csm.jpg|Dewbot V's second drive (pulling trailer)
 
File:DB5_jig_for_welding_hopper_stand-offs_090131_csm.jpg|Jig used in welding hopper stand-offs
 
File:DB5_jig_for_welding_hopper_stand-offs_090131_csm.jpg|Jig used in welding hopper stand-offs
 
File:DB5_welding_hopper_stand-offs_090131_csm.jpg|Siri Maley welding hopper stand-offs to uprights
 
File:DB5_welding_hopper_stand-offs_090131_csm.jpg|Siri Maley welding hopper stand-offs to uprights

Revision as of 12:15, 20 June 2009

This page contains a week by week breakdown of what we did.

Kickoff

We attended the kickoff at Upper Darby HS where we were introduced to Lunacy via the NASA telecast from FIRST's New Hampshire headquarters.

Week One - Research and Brainstorm (1/3-1/10)

  • Inventoried the Kit of Parts
  • Researched previous designs in old FIRST Behind the Design books
  • Discussed dumping versus shooting, benefits of rotating, etc
  • Researched, tested, and analyzed Rover wheels' frictional coefficients
  • Analyzed wide versus long chassis and 4 wheel versus 6 wheel drivetrain
  • Settled on 6-wheel drive wide chassis, designed based on the hypothetical 2008 drive system, cut necessary pieces
  • Began discussing fishtailing the trailer and perpendicular/pivot wheels
  • Began designing Moon Rock pick-up system and Empty Cell holder (t-rex gripper)
  • Began discussing heads-up display
  • Welding practice
  • Worked on building trailers
  • Began developing meeting planning model
  • Began discussing field-sharing with local teams
Week One Photo Gallery


Week Two - Prototype and Chassis Fabrication (1/11-1/17)

  • Welding practice
  • Welded chassis
  • Researched and prototyped spiral hopper with brushes
  • Designed 7th Wheel
  • Determined control strategy details
  • Worked on drive programming
  • Worked on trailers
  • Discussed field-sharing with local teams
Week Two Photo Gallery


Week Three - Chassis Fabrication and Hopper Prototyping (1/18-1/24)

  • Examined stiff, spiral vanes
  • Examined lexan-walled or aluminum-railed hopper
  • Prototyped hopper and spindle (determined entire turret would rotate with potentiometer)
  • Designed aluminum rail hopper
  • Prototyped wheel and pneumatic shooters
  • Designed single under-ball shooter
  • Welded frame
  • Completed and painted chassis
  • Began fabricating 7th Wheel
  • Milled gearbox gears
  • Completed gearboxes
  • Began wheel drive modules
  • Worked on drive programming
  • Examined traction control
  • Worked on camera-control of hopper
  • Continued discussing heads-up display
  • Completed first trailer and outpost, continued working on second
  • Continued developing meeting planning model
Week Three Photo Gallery


Week Four - Hopper Fabrication (1/25-1/31)

  • Prototyped beater-bar shooters
  • Settled on pneumatic shooter
  • Milled bearing blocks
  • Finished wheel drive modules
  • Fabricated beater-bar
  • Drove chassis base
  • Finished 7th Wheel
  • Finished tank drive programming
  • Designed battery mount
  • Bent and welded outer hopper spiral
Week Four Photo Gallery

Week Five

  • Designed electronics panels
  • Tested beater-bar
  • Fabricated spindle
  • Finished 7th Wheel mount
  • Finished 7th Wheel drive programming
  • Wrote basic operational spec
  • Scrapped t-rex claw for Empty Cell idea

Week Six

Beth paints the box, we assemble the box outside in the freezing cold and we ship the robot.