(Week Four - Hopper Fabrication (1/25-1/31))
(Week Six)
 
(20 intermediate revisions by the same user not shown)
Line 19: Line 19:
 
*Began discussing field-sharing with local teams
 
*Began discussing field-sharing with local teams
  
====Week One Photo Gallery====
+
;[[DEWBOT V Week One Build Season Photo Gallery|Week One Photo Gallery]]
 
 
<gallery widths=250 heights=250>
 
File:DB5_Clark_dismantling_overpass_090104_csm.jpg|Alex Clark dismantling last year's field equipment
 
File:DB5_control_testbed_090108_csm.jpg|cRIO control testbed (built by Frank Stumpo)
 
File:DB5_McKown_field_assembly_090108_csm.jpg|Faith McKown cuts lumber for Trailers
 
File:DB5_John_Stumpo_090108_csm.jpg|John Stumpo working on the Trailer
 
File:DB5_Featherman_Stumpo_control_planning_090108_csm.jpg|Scott Featherman & Frank Stumpo in control discussion
 
File:DB5_Klufas_testing_testbed_090110_csm.jpg|Paul Klufas working with the cRIO testbed
 
File:DB5_McKown_drilling_gearbox_plates_090110_csm.jpg|Heather McKown drilling gearbox plates
 
</gallery>
 
  
 
===Week Two - Prototype and Chassis Fabrication (1/11-1/17)===
 
===Week Two - Prototype and Chassis Fabrication (1/11-1/17)===
Line 41: Line 31:
 
*Discussed field-sharing with local teams
 
*Discussed field-sharing with local teams
  
====Week Two Photo Gallery====
+
;[[DEWBOT V Week Two Build Season Photo Gallery|Week Two Photo Gallery]]
 
 
<gallery widths=250 heights=250>
 
File:DB5_frame_rear_on_form_090111_csm_1.jpg|Rear frame pieces clamped to form in preparation for welding
 
File:DB5_Klufas_Schucker_hopper_proto_base_090112_csm.jpg|Matt Klufas with Foster Schucker cutting hopper prototype base
 
File:DB5_Murphy_gearbox_plates_090112_csm_1.jpg|Elizabeth Murphy drilling gearbox plates
 
File:DB5_Murphy_gearbox_plates_090112_csm_2.jpg|Gearbox plate drilling detail
 
File:DB5_Klufas_programming_090112_csm.jpg|Paul Klufas programming cRIO
 
File:DB5_Klufas_cutting_hopper_proto_090112_csm.jpg|Matt Klufas cutting hopper prototype brackets with bandsaw
 
File:DB5_Bachmann_gearbox_plates_090117_csm.jpg|Julie Bachmann drilling gearbox plates
 
File:DB5_back_frame_welding_090117_csm.jpg|Welding started on Dewbot V back frame
 
File:DB5_McKown_Bachmann_gearbox_090117_csm.jpg|Heather McKown & Julie Bachmann with gearbox plates
 
File:DB5_McKown_trailer_fab_090117_csm.jpg|Faith McKown building Lunacy practice trailers
 
File:DB5_McKown_K_gearbox_090117_csm.jpg|Heather McKown & K drilling gearbox plates
 
File:DB5_Maley_back_frame_welding_090117_csm.jpg|Siri Maley welding Dewbot V back frame
 
File:DB5_Clark_hopper_proto_090117_csm.jpg|Alex Clark securing ramp into hopper prototype top
 
File:DB5_Murphy_hopper_proto_090117_csm.jpg|Elizabeth Murphy securing ramp into hopper prototype bottom
 
File:DB5_Clark_Murphy_hopper_proto_090117_csm.jpg|Alex Clark & Elizabeth Murphy with hopper prototype
 
File:DB5_McKown_turnings_090117_csm.jpg|Heather McKown has aluminum on her mind
 
</gallery>
 
  
 
===Week Three - Chassis Fabrication and Hopper Prototyping (1/18-1/24)===
 
===Week Three - Chassis Fabrication and Hopper Prototyping (1/18-1/24)===
Line 82: Line 53:
 
*Continued developing meeting planning model
 
*Continued developing meeting planning model
  
====Week Three Photo Gallery====
+
;[[DEWBOT V Week Three Build Season Photo Gallery|Week Three Photo Gallery]]
 
 
<gallery widths=250 heights=250>
 
File:DB5_frame_welding_090118_csm_1.jpg|Rear frame on form
 
File:DB5_frame_welding_090118_csm_2.jpg|
 
File:DB5_frame_welding_090118_csm_3.jpg|Frame assembled on form
 
File:DB5_Maley_frame_welding_090118_csm_1.jpg|Siri Maley welding Dewbot V's frame
 
File:DB5_Maley_frame_welding_090118_csm_2.jpg|Siri Maley welding Dewbot V's frame
 
File:DB5_Maley_frame_welding_090118_csm_3.jpg
 
File:DB5_Maley_frame_welding_090118_csm_4.jpg
 
File:DB5_trailer_bumpers_090118_csm.jpg|Lunacy trailer bumper assembly
 
File:DB5_Maley_grinding_frame_090118_csm.jpg|Siri Maley grinding welds on Dewbot V's frame
 
File:DB5_frame_weigh-in_090118_csm.jpg|Weigh-in for frame weldment - 10.5 lb - exactly on prediction
 
File:DB5_Davis_hopper_proto_090118_csm_1.jpg|Jon Davis assembles hopper prototype
 
File:DB5_Davis_Schucker_hopper_test_090118_csm_1.jpg|Foster Schucker watches as Jon Davis tests hopper prototype
 
File:DB5_gearbox_090124_csm.jpg|Dewbot V custom gearbox
 
File:DB5_gearbox_mass_090124_csm.jpg|gearbox & CIM mass
 
File:DB5_McKown_090124_csm.jpg|Heather McKown
 
File:DB5_Mckown_breaking_chain_090124.jpg|Carly McKown breaking chain
 
</gallery>
 
  
 
===Week Four - Hopper Fabrication (1/25-1/31)===
 
===Week Four - Hopper Fabrication (1/25-1/31)===
Line 115: Line 67:
 
*Bent and welded outer hopper spiral
 
*Bent and welded outer hopper spiral
  
====Week Three Photo Gallery====
+
;[[DEWBOT V Week Four Build Season Photo Gallery|Week Four Photo Gallery]]
  
<gallery widths=250 heights=250>
+
===Week Five (2/1-2/7)===
File:DB5_McKown_breaking_chain_090124.jpg|Carly McKown breaking chain
 
</gallery>
 
 
 
===Week Five===
 
 
*Designed electronics panels
 
*Designed electronics panels
 
*Tested beater-bar
 
*Tested beater-bar
Line 130: Line 78:
 
*Scrapped t-rex claw for Empty Cell idea
 
*Scrapped t-rex claw for Empty Cell idea
  
===Week Six===
+
;[[DEWBOT V Week Five Build Season Photo Gallery|Week Five Photo Gallery]]
 +
 
 +
===Week Six (2/8-2/14)===
  
 
Beth paints the box, we assemble the box outside in the freezing cold and we ship the robot.
 
Beth paints the box, we assemble the box outside in the freezing cold and we ship the robot.
  
[[Category:Events]][[Category:DEWBOT V]]
+
;[[DEWBOT V Week Six Build Season Photo Gallery|Week Six Photo Gallery]]
 +
 
 +
===Final Few Build Daze (2/15-2/17)===
 +
 
 +
Beth paints the box, we assemble the box outside in the freezing cold and we ship the robot.
 +
 
 +
;[[DEWBOT V Final Daze Build Season Photo Gallery|Final Daze Photo Gallery]]
 +
 
 +
----
 +
[[Category:Robot]][[Category:DEWBOT V]][[Category:DEWBOT V Build]]

Latest revision as of 18:32, 20 June 2009

This page contains a week by week breakdown of what we did.

Kickoff

We attended the kickoff at Upper Darby HS where we were introduced to Lunacy via the NASA telecast from FIRST's New Hampshire headquarters.

Week One - Research and Brainstorm (1/3-1/10)

  • Inventoried the Kit of Parts
  • Researched previous designs in old FIRST Behind the Design books
  • Discussed dumping versus shooting, benefits of rotating, etc
  • Researched, tested, and analyzed Rover wheels' frictional coefficients
  • Analyzed wide versus long chassis and 4 wheel versus 6 wheel drivetrain
  • Settled on 6-wheel drive wide chassis, designed based on the hypothetical 2008 drive system, cut necessary pieces
  • Began discussing fishtailing the trailer and perpendicular/pivot wheels
  • Began designing Moon Rock pick-up system and Empty Cell holder (t-rex gripper)
  • Began discussing heads-up display
  • Welding practice
  • Worked on building trailers
  • Began developing meeting planning model
  • Began discussing field-sharing with local teams
Week One Photo Gallery

Week Two - Prototype and Chassis Fabrication (1/11-1/17)

  • Welding practice
  • Welded chassis
  • Researched and prototyped spiral hopper with brushes
  • Designed 7th Wheel
  • Determined control strategy details
  • Worked on drive programming
  • Worked on trailers
  • Discussed field-sharing with local teams
Week Two Photo Gallery

Week Three - Chassis Fabrication and Hopper Prototyping (1/18-1/24)

  • Examined stiff, spiral vanes
  • Examined lexan-walled or aluminum-railed hopper
  • Prototyped hopper and spindle (determined entire turret would rotate with potentiometer)
  • Designed aluminum rail hopper
  • Prototyped wheel and pneumatic shooters
  • Designed single under-ball shooter
  • Welded frame
  • Completed and painted chassis
  • Began fabricating 7th Wheel
  • Milled gearbox gears
  • Completed gearboxes
  • Began wheel drive modules
  • Worked on drive programming
  • Examined traction control
  • Worked on camera-control of hopper
  • Continued discussing heads-up display
  • Completed first trailer and outpost, continued working on second
  • Continued developing meeting planning model
Week Three Photo Gallery

Week Four - Hopper Fabrication (1/25-1/31)

  • Prototyped beater-bar shooters
  • Settled on pneumatic shooter
  • Milled bearing blocks
  • Finished wheel drive modules
  • Fabricated beater-bar
  • Drove chassis base
  • Finished 7th Wheel
  • Finished tank drive programming
  • Designed battery mount
  • Bent and welded outer hopper spiral
Week Four Photo Gallery

Week Five (2/1-2/7)

  • Designed electronics panels
  • Tested beater-bar
  • Fabricated spindle
  • Finished 7th Wheel mount
  • Finished 7th Wheel drive programming
  • Wrote basic operational spec
  • Scrapped t-rex claw for Empty Cell idea
Week Five Photo Gallery

Week Six (2/8-2/14)

Beth paints the box, we assemble the box outside in the freezing cold and we ship the robot.

Week Six Photo Gallery

Final Few Build Daze (2/15-2/17)

Beth paints the box, we assemble the box outside in the freezing cold and we ship the robot.

Final Daze Photo Gallery