Difference between revisions of "DEWBOT V Build"

From DEW Robotics
Jump to: navigation, search
(Created page with 'This page contains a week by week breakdown of what we did. '''Kickoff''' We attended the kickoff at ??? where we were introduced to Lunacy. '''Week One - Design''' We des...')
 
Line 2: Line 2:
  
 
'''Kickoff'''
 
'''Kickoff'''
 +
 
We attended the kickoff at ??? where we were introduced to Lunacy.   
 
We attended the kickoff at ??? where we were introduced to Lunacy.   
  
Line 21: Line 22:
  
 
Beth paints the box, we assemble the box outside in the freezing cold and we ship the robot.
 
Beth paints the box, we assemble the box outside in the freezing cold and we ship the robot.
 +
 +
----
 +
[[DEWBOT V]] main page

Revision as of 19:28, 17 May 2009

This page contains a week by week breakdown of what we did.

Kickoff

We attended the kickoff at ??? where we were introduced to Lunacy.

Week One - Design

We designed stuff

Week Two - Prototype

We built some prototypes

Week Three

Week Four

Week Five

Week Six

Beth paints the box, we assemble the box outside in the freezing cold and we ship the robot.


DEWBOT V main page