|10/29/14
|  
+
|6-9
 
|TCHS Brandywine
 
|TCHS Brandywine
|  
+
|Josh, CJ, Laura
 
|}
 
|}
  
Line 23: Line 23:
 
| '''Mounting IR beacon sensor'''
 
| '''Mounting IR beacon sensor'''
 
|  
 
|  
* Josh worked to mount the sensor for the IR beacon so it would stay in the 18in. box. he completed this task with around 1/2 inches to spare.
+
* Josh worked to mount the sensor for the IR beacon so it would stay in the 18in. box. He completed this task with around 1/2 inches to spare.
|-
+
It was mounted to a servo so it could extend to the appropriate height for the IR beacon.
 
|-  
 
|-  
| '''reverse gabber servo motors'''
+
| '''Reverse goal grabber servo motors'''
 
|  
 
|  
 
* Josh had to work with Laura to reverse the servo motors due to the wires connecting it to the controller were on the outside.
 
* Josh had to work with Laura to reverse the servo motors due to the wires connecting it to the controller were on the outside.
|-
 
 
|-
 
|-
 
|'''Change battery position'''
 
|'''Change battery position'''

Revision as of 03:16, 31 October 2014

Competition Season Meeting

Meeting Date Meeting Time Location Attendees
10/29/14 6-9 TCHS Brandywine Josh, CJ, Laura


Tasks Reflections
FRC lessons
  • CJ and Laura went to learn and complete tasks in FRC. CJ watched a presentation on CAD and tasks in a FRC build season. He learned about how to use CAD to create complex parts and assemblies. Additionally, he learned on what to do after a game release and how to use the 6 weeks given in FRC efficiently. The knowledge gathered from the presentation gave him ideas on completing the robot efficiently in a reasonable time period.
Mounting IR beacon sensor
  • Josh worked to mount the sensor for the IR beacon so it would stay in the 18in. box. He completed this task with around 1/2 inches to spare.

It was mounted to a servo so it could extend to the appropriate height for the IR beacon.

Reverse goal grabber servo motors
  • Josh had to work with Laura to reverse the servo motors due to the wires connecting it to the controller were on the outside.
Change battery position
  • Josh changed the battery position from the top of the robot to the back due to the top-heaviness when it was on top.
mounted servo controller
  • Josh mounted the servo controller next to the battery.
mounted power switch plate that shows that it is a power switch
  • josh cut plastic then attached it to the top next to the power switch.
***Enter task here
  • enter description


Recorded by: Date: Journal Editor: Date: