Difference between revisions of "FTC 7314 Engineering Notebook 2014-11-19"

From DEW Robotics
Jump to: navigation, search
(Competition Season Meeting)
(Competition Season Meeting)
Line 39: Line 39:
  
 
|} <!-- End of tasks table; DO NOT REMOVE -->
 
|} <!-- End of tasks table; DO NOT REMOVE -->
 +
== Action and idea Journal==
 +
<gallery widths=250 heights=250 perrow=3>
 +
image:FTC7314-141119a.jpg|
 +
image:FTC7314-141119b.jpg|
 +
</gallery>
  
 
<br />
 
<br />

Revision as of 10:46, 21 November 2014

Competition Season Meeting

Meeting Date Meeting Time Location Attendees
11/19/14 6-9pm TCHS Brandywine Josh, Justin, Braden, Laura, Nick


Tasks Reflections
Intake Work
  • Josh, Justin, and Braden added the surgical tubing, zip ties, motors, and chain for the intake.
  • It is now fully functional when plugged into a battery.
Bapper on Chassis
  • The 90 degree bend pipe was added to the chassis.
  • The intake can get a ball into the pipe when aimed correctly. Soon, a guide will added to funnel the balls into the pipe.
  • The bapper will be moved from the prototype to the chassis next meeting.
Autonomous
  • Today, Nick and Laura worked on the parking zone autonomous.
  • First, we added the encoder wires to the robot, so we could use them in autonomous.
  • Then, we wrote the code to line up with the center goal, and knock down the kickstand after finding the IR beacon.
  • Due to a parents meeting, we were unable to test this code. All moves/turns are written with values that we estimated to be approximately correct.
  • Next meeting, we will test the code we have, and change the values where needed.

Action and idea Journal


Recorded by: Date: Journal Editor: Date: