Difference between revisions of "FTC 7314 Engineering Notebook 2015-10-26"
From DEW Robotics
MaiKangWei (talk | contribs) |
MaiKangWei (talk | contribs) (→Competition Season Meeting) |
||
Line 8: | Line 8: | ||
| 6:00-9:00 PM | | 6:00-9:00 PM | ||
| TCHS Brandywine | | TCHS Brandywine | ||
− | | Trevor, Josh, Daniel, Braden, Seth, Akhila, Amal, Bennett, Matt, Trent, Myles | + | | Trevor, Josh, Daniel, Braden, Seth, Akhila, Amal, Bennett, Matt, Trent, Myles, Justin |
|} | |} | ||
Line 48: | Line 48: | ||
| | | | ||
* Myles worked on his driving using a smaller robot made by Daniel. | * Myles worked on his driving using a smaller robot made by Daniel. | ||
− | *Seth helped with the practice, and anywhere else he could. | + | * Seth helped with the practice, and anywhere else he could. |
|- | |- | ||
| '''Programing lesson''' | | '''Programing lesson''' | ||
Line 54: | Line 54: | ||
* Justin listened to the programing part of our operation. Justin also helped in the workshop. | * Justin listened to the programing part of our operation. Justin also helped in the workshop. | ||
* Amal was helping to program the color sensor. Amal also listened and watch Akhila program on her laptop. | * Amal was helping to program the color sensor. Amal also listened and watch Akhila program on her laptop. | ||
+ | * Today we tried to get the color sensors working. We encountered some problems but we worked out most of the kinks. I feel that I was less productive today than at the last meeting. I was tired and distracted. I could have done better | ||
|- | |- | ||
− | | ''' | + | | '''Worm gear assembly''' |
| | | | ||
− | * Trent | + | * Trent and Braden worked with Clem to build the first worm gear assembly. This assembly, with a 4:1 reduction and a Tetrix motor, will be used to elevate and depress the forward drive-train extension. |
|- | |- | ||
| '''finish welding chassis''' | | '''finish welding chassis''' | ||
| | | | ||
− | * Trevor, Josh, and mentor Keith worked to finish the chassis | + | * Trevor, Josh, and mentor Keith worked to finish the chassis favwhich was begun on Wednesday. In the making of this chassis we also started the extension. |
|- | |- | ||
− | |||
− | |||
|} <!-- End of tasks table; DO NOT REMOVE --> | |} <!-- End of tasks table; DO NOT REMOVE --> | ||
Revision as of 11:20, 27 October 2015
Competition Season Meeting
Meeting Date | Meeting Time | Location | Attendees |
---|---|---|---|
26-October-2015 | 6:00-9:00 PM | TCHS Brandywine | Trevor, Josh, Daniel, Braden, Seth, Akhila, Amal, Bennett, Matt, Trent, Myles, Justin |
Objectives / Systems | Hypotheses, tests, observations, conclusions, plans |
---|---|
Chassis Fabrication |
|
Objective in bold |
|
Tasks | Reflections | |
---|---|---|
Axle Preparation |
|
|
Driving Practice |
| |
Programing lesson |
| |
Worm gear assembly |
| |
finish welding chassis |
|
Action and idea Journal
Recorded by: | Date: | Journal Editor: | Date: |
---|---|---|---|