==26-October==
 
==26-October==
 +
A productive day.  We:
 +
* Cut, bent and otherwise fabricated and installed the robot's electronics panels...
 +
* ...and rationally installed many of the key electronic components (NXT & Motor Controllers)
 +
* Replaced the 4:1 worm gear with 20:1
 +
* Started mounting IR Seeker sensors
 +
* Scoped out where the limit switches ought to be mounted
 +
* Worked on autonomous coding
 +
 
<gallery widths=250 heights=250 perrow=3>
 
<gallery widths=250 heights=250 perrow=3>
 
Image:FTC7413_131026_csm-1.jpg|Drew, Heather McKown & CJ
 
Image:FTC7413_131026_csm-1.jpg|Drew, Heather McKown & CJ
 
Image:FTC7413_131026_csm-2.jpg|Drew
 
Image:FTC7413_131026_csm-2.jpg|Drew
 
Image:FTC7413_131026_csm-3.jpg|CJ
 
Image:FTC7413_131026_csm-3.jpg|CJ
Image:FTC7413_131026_csm-4.jpg|Trevor, [[User:gdeaver | Gary Deaver]], Drew, [[User:Mcbc | Julie Christopher]]
+
Image:FTC7413_131026_csm-4.jpg|Trevor, [[User:gdeaver | Gary Deaver]], Drew, [[User:Jcbc | Julie Christopher]]
 
Image:FTC7413_131026_csm-5.jpg|Electronics panel
 
Image:FTC7413_131026_csm-5.jpg|Electronics panel
 
Image:FTC7413_131026_csm-6.jpg|Robot
 
Image:FTC7413_131026_csm-6.jpg|Robot

Revision as of 23:43, 26 October 2013

3-October

Eric, Brad & CJ adding arms to current configuration

5-October

10-October

12-October

17-October

19-October - Duel on the Delaware

24-October

26-October

A productive day. We:

  • Cut, bent and otherwise fabricated and installed the robot's electronics panels...
  • ...and rationally installed many of the key electronic components (NXT & Motor Controllers)
  • Replaced the 4:1 worm gear with 20:1
  • Started mounting IR Seeker sensors
  • Scoped out where the limit switches ought to be mounted
  • Worked on autonomous coding