Difference between revisions of "FTC 7314 build October 2013"

From DEW Robotics
Jump to: navigation, search
(26-October)
(26-October)
Line 53: Line 53:
 
* Replaced the 4:1 worm gear with 20:1
 
* Replaced the 4:1 worm gear with 20:1
 
* Started mounting IR Seeker sensors
 
* Started mounting IR Seeker sensors
 +
* Built the lower part of the flag pole
 +
* Installed the flag lift
 
* Scoped out where the limit switches ought to be mounted
 
* Scoped out where the limit switches ought to be mounted
 
* Worked on autonomous coding
 
* Worked on autonomous coding

Revision as of 23:44, 26 October 2013

3-October

Eric, Brad & CJ adding arms to current configuration

5-October

10-October

12-October

17-October

19-October - Duel on the Delaware

24-October

26-October

A productive day. We:

  • Cut, bent and otherwise fabricated and installed the robot's electronics panels...
  • ...and rationally installed many of the key electronic components (NXT & Motor Controllers)
  • Replaced the 4:1 worm gear with 20:1
  • Started mounting IR Seeker sensors
  • Built the lower part of the flag pole
  • Installed the flag lift
  • Scoped out where the limit switches ought to be mounted
  • Worked on autonomous coding