Difference between revisions of "Stronghold Meeting -03-Feb-2016"

From DEW Robotics
Jump to: navigation, search
(CAD & Design)
Line 1: Line 1:
 +
<big>[[Stronghold Meeting -02-Feb-2016 | << PREVIOUS]] -- [[Stronghold Meeting -04-Feb-2016 | NEXT>>]] -- [[DEWBOT_XII_Week_Four_Build_Season_Photo_Gallery#Wednesday_February_3.2C_2016 |PHOTOS]] </big>
 +
 
=='''Competition Season Meeting'''==
 
=='''Competition Season Meeting'''==
  
Line 38: Line 40:
 
|<br /><br />
 
|<br /><br />
 
|}
 
|}
 +
 +
<big>[[Stronghold Meeting -02-Feb-2016 | << PREVIOUS]] -- [[Stronghold Meeting -04-Feb-2016 | NEXT>>]] -- [[DEWBOT_XII_Week_Four_Build_Season_Photo_Gallery#Wednesday_February_3.2C_2016 |PHOTOS]] </big>
 +
 
----
 
----
 
[[Category:DEWBOT XII]][[Category:Engineering]]
 
[[Category:DEWBOT XII]][[Category:Engineering]]

Revision as of 16:41, 8 February 2016

<< PREVIOUS -- NEXT>> -- PHOTOS

Competition Season Meeting

Meeting Date Meeting Time Location Attendees
TCHS Brandywine

CAD & Design

Tonight we determined that our previous chassis design would not be suitable for our catapult, and so we have decided to redesign. The new chassis will give adequate space for the catapult, and work on the electronics board was started.

Mechanical

Programming

Strategy

Field Elements

Other



Recorded by: Date: Journal Editor: Date:








<< PREVIOUS -- NEXT>> -- PHOTOS