Difference between revisions of "Stronghold Meeting -03-Feb-2016"
From DEW Robotics
MaiKangWei (talk | contribs) |
(→Programming) |
||
Line 18: | Line 18: | ||
==Programming== | ==Programming== | ||
+ | |||
+ | - We worked on power management | ||
+ | |||
+ | :- We logged the voltage and current from the PDP and graphed it in excel | ||
+ | |||
+ | :- We ran the robot into an immovable object to see how the voltage and current responded. | ||
==Strategy== | ==Strategy== |
Latest revision as of 19:20, 16 February 2016
<< PREVIOUS -- NEXT>> -- PHOTOS
Contents
Competition Season Meeting
Meeting Date | Meeting Time | Location | Attendees |
---|---|---|---|
TCHS Brandywine |
CAD & Design
Tonight we determined that our previous chassis design would not be suitable for our catapult, and so we have decided to redesign. The new chassis will give adequate space for the catapult, and work on the electronics board was started.
Mechanical
Programming
- We worked on power management
- - We logged the voltage and current from the PDP and graphed it in excel
- - We ran the robot into an immovable object to see how the voltage and current responded.
Strategy
Field Elements
Other
Recorded by: | Date: | Journal Editor: | Date: |
---|---|---|---|
<< PREVIOUS -- NEXT>> -- PHOTOS