Difference between revisions of "Talk:DEWBOT VII Philadelphia Regional"
From DEW Robotics
(→Put on Competition Claw) |
MaiKangWei (talk | contribs) (→Switch from Pulley to Chain Drive) |
||
Line 2: | Line 2: | ||
''Add part locations (probably the spare parts box), hardware and tools, etc.''<br> | ''Add part locations (probably the spare parts box), hardware and tools, etc.''<br> | ||
===Switch from Pulley to Chain Drive=== | ===Switch from Pulley to Chain Drive=== | ||
− | + | :#Remove arm drive motor assembly from arm column | |
+ | :#Unbolt arm angle senor mount; remove arm sensor | ||
+ | :#Remove elastic counterbalance | ||
+ | :#Unbolt lower bar pillow blocks | ||
+ | :#Unbolt lower bar at triangle | ||
+ | :#Remove lower bar | ||
+ | :#Unbolt (2) ¼"-20 bolts securing 56T | ||
*Calibrate PID & check presets | *Calibrate PID & check presets | ||
*Mount chain guards | *Mount chain guards | ||
+ | |||
===Put on Competition Claw=== | ===Put on Competition Claw=== | ||
*Unscrew jam nuts at linkages & unplug pneumatics | *Unscrew jam nuts at linkages & unplug pneumatics |
Revision as of 15:57, 27 March 2011
Contents
To Do List for Thursday
Add part locations (probably the spare parts box), hardware and tools, etc.
Switch from Pulley to Chain Drive
- Remove arm drive motor assembly from arm column
- Unbolt arm angle senor mount; remove arm sensor
- Remove elastic counterbalance
- Unbolt lower bar pillow blocks
- Unbolt lower bar at triangle
- Remove lower bar
- Unbolt (2) ¼"-20 bolts securing 56T
- Calibrate PID & check presets
- Mount chain guards
Put on Competition Claw
- Unscrew jam nuts at linkages & unplug pneumatics
- Screw in Competition Claw's jaw nuts at linkages & plug in pneumatics
- Test floor height and wrist & jaw actuation.
- Any time: put on longer start position Velcro
- Note: but always take off the bungee cord before the match!
Switch Compressors
- Unscrew compressor mount bars
- Unplug pneumatic hose and remove compressor
- Do we want a jig?
- Drill new mount holes for bar that's shifting
- Do we need to tap those holes?
- Screw in new bars with compressor & plug in pneumatic hose
Turn around Minibot Deployment
- Unscrew Bident & staff and pull out
- Unscrew back plate (with cylinder)
- Ensure pneumatic hoses are labeled
- Unscrew Standoffs (keep rollers on them)
- Put jig in place & drill new Standoff & back plate holes
- Screw Standoffs & back plate in place
- Ensure back plate is within frame perimeter
- Ensure rear-most rollers are off-centered towards the front (as far from the Bident as possible, or it may go outside of the frame perimeter).
- Screw the new Bident & staff into the cylinder
- Ensure Bident is in frame perimeter
Mount Hangar
- Put on top edge clamp (4 bolts)
- C-clamp bottom angle in place
- Ensure Hangar is in frame perimeter
- Drill bottom angle mount holes in frame perimeter
Install Torsion Brace
- Install top brace clamp (8 bolts)
- C-clamp bottom plates in place & drill H holes in frame
- Bolt bottom plates in place (4 bolts)
Mount Camera
- Drill mount holes (should be make a jig?)
- Mount camera
- Mount iron sight
- Test/calibrate