Difference between revisions of "Move to CCIU Technical College High School"
From DEW Robotics
MaiKangWei (talk | contribs) |
MaiKangWei (talk | contribs) |
||
Line 12: | Line 12: | ||
Image:CCIU_130723_csm-3.jpg| | Image:CCIU_130723_csm-3.jpg| | ||
Image:CCIU_130723_csm-4.jpg|Joe Passante - Facilities Manager | Image:CCIU_130723_csm-4.jpg|Joe Passante - Facilities Manager | ||
− | Image:CCIU_130723_csm-5.jpg| | + | Image:CCIU_130723_csm-5.jpg|The mill won't fit through here! |
Image:CCIU_130723_csm-6.jpg| | Image:CCIU_130723_csm-6.jpg| | ||
Image:CCIU_130723_csm-9.jpg|Outside of enclosed warehouse space | Image:CCIU_130723_csm-9.jpg|Outside of enclosed warehouse space |
Revision as of 12:08, 24 July 2013
The enclosure of our warehouse space is almost complete, together with the running of electrical service.
I've noted to Joe Passante that the mill will not fit through the single door.
It looks as if we will be able to get four (4) fobs for entry. We need to decide who will hold these.
We will share the classroom space with John Ciallela's FTC Team. Should not be a problem, as they meet during school hours.