Difference between revisions of "Move to CCIU Technical College High School"

From DEW Robotics
Jump to: navigation, search
Line 5: Line 5:
 
It looks as if we will be able to get four (4) fobs for entry.  We need to decide who will hold these.
 
It looks as if we will be able to get four (4) fobs for entry.  We need to decide who will hold these.
  
We will share the classroom space with John Ciallela's FTC Team.  Should not be a problem, as they meet during school hours.
+
We will share the classroom space with John Cilladi's FTC Team.  Should not be a problem, as they meet during school hours.
  
 
Our practice field set-up will be in the warehouse area (outside the enclosed work space).  This will make things easier for us.
 
Our practice field set-up will be in the warehouse area (outside the enclosed work space).  This will make things easier for us.

Revision as of 12:21, 24 July 2013

The enclosure of our warehouse space is almost complete, together with the running of electrical service. The area is 20' x 50'.

I've noted to Joe Passante that the mill will not fit through the single door. This will be fixed.

It looks as if we will be able to get four (4) fobs for entry. We need to decide who will hold these.

We will share the classroom space with John Cilladi's FTC Team. Should not be a problem, as they meet during school hours.

Our practice field set-up will be in the warehouse area (outside the enclosed work space). This will make things easier for us.