The enclosure of our warehouse space is almost complete, together with the running of electrical service.  The area is 20' x 50' (1,000 ft²).
+
The enclosure of our warehouse space is almost complete, together with the running of electrical service.  The area is 20' x 50' (1,000 ft²).  The CCIU will not provide furnishings for this area.
  
 
I've noted to Joe Passante that the mill will not fit through the single door.  This will be fixed.
 
I've noted to Joe Passante that the mill will not fit through the single door.  This will be fixed.
Line 5: Line 5:
 
It looks as if we will be able to get four (4) fobs for entry.  We need to decide who will hold these.
 
It looks as if we will be able to get four (4) fobs for entry.  We need to decide who will hold these.
  
We will share the classroom space with John Cilladi's FTC Team.  Should not be a problem, as they meet during school hours.  The classroom space is about 1,600 ft²
+
We will share the classroom space with John Cilladi's FTC Team.  Should not be a problem, as they meet during school hours.  The classroom space is about 1,600 ft².  It is likely that this space will be furnished by the CCIU.
  
 
Our practice field set-up will be in the warehouse area (outside the enclosed work space).  This will make things easier for us.
 
Our practice field set-up will be in the warehouse area (outside the enclosed work space).  This will make things easier for us.

Revision as of 12:35, 24 July 2013

The enclosure of our warehouse space is almost complete, together with the running of electrical service. The area is 20' x 50' (1,000 ft²). The CCIU will not provide furnishings for this area.

I've noted to Joe Passante that the mill will not fit through the single door. This will be fixed.

It looks as if we will be able to get four (4) fobs for entry. We need to decide who will hold these.

We will share the classroom space with John Cilladi's FTC Team. Should not be a problem, as they meet during school hours. The classroom space is about 1,600 ft². It is likely that this space will be furnished by the CCIU.

Our practice field set-up will be in the warehouse area (outside the enclosed work space). This will make things easier for us.

We will need to be very selective about what we bring to the CCIU. We do not have nearly enough space for all of the stuff we have accumulated.