Difference between revisions of "DEWBOT XII Week Three Build Season Photo Gallery"

From DEW Robotics
Jump to: navigation, search
(Saturday January 30, 2016)
(Friday January 29, 2016)
Line 46: Line 46:
 
==Friday January 29, 2016==
 
==Friday January 29, 2016==
 
<gallery widths=250 heights=250 perrow=3>
 
<gallery widths=250 heights=250 perrow=3>
Image:DB12_160129-1.jpg|
+
Image:DB12_160129-1.jpg|Water jetted drive side plates
Image:DB12_160129-2.jpg|
+
Image:DB12_160129-2.jpg|Andrew with (outer) side plate
Image:DB12_160129-3.jpg|
+
Image:DB12_160129-3.jpg|Aashay deburrs a side plate
Image:DB12_160129-4.jpg|
+
Image:DB12_160129-4.jpg|Paul prepared outer side plates for milling the bearing holes
Image:DB12_160129-5.jpg|
+
Image:DB12_160129-5.jpg|Drilling mounting holes in axle ends
Image:DB12_160129-6.jpg|
+
Image:DB12_160129-6.jpg|Jarryd on CNC lathe
Image:DB12_160129-7.jpg|
+
Image:DB12_160129-7.jpg|Axles - some drilled
Image:DB12_160129-8.jpg|
+
Image:DB12_160129-8.jpg|David Kirk, Charley & Sam assembling hanging field element
Image:DB12_160129-9.jpg|
+
Image:DB12_160129-9.jpg|Alicia & Patrick
Image:DB12_160129-10.jpg|
+
Image:DB12_160129-10.jpg|Dana, Douglas & Fatima on the bandsaw
Image:DB12_160129-11.jpg|
+
Image:DB12_160129-11.jpg|We need to mill the large hole for press fit of 1/2" flanged bearings
Image:DB12_160129-12.jpg|
+
Image:DB12_160129-12.jpg|Abbi & friend with John Weissman
Image:DB12_160129-13.jpg|
+
Image:DB12_160129-13.jpg|Sam
Image:DB12_160129-14.jpg|
+
Image:DB12_160129-14.jpg|Charley
Image:DB12_160129-15.jpg|
+
Image:DB12_160129-15.jpg|David Kirk checks level
 
</gallery>
 
</gallery>
  

Revision as of 13:37, 1 February 2016

Sunday & Monday were lost to the Snowstorm

Tuesday January 26, 2016

Wednesday January 27, 2016

Thursday January 28, 2016

Friday January 29, 2016

Saturday January 30, 2016