Search results

From DEW Robotics
Jump to: navigation, search
  • :On the way home, we continued an ancient and time-honored team tradition by spending the morning of Sunday, 20-July at the [h ...enjoy some sunshine and play with some younger Chester Countians. A good time was had by all.
    19 KB (2,840 words) - 21:44, 14 December 2014
  • ...Salem Community College, Carney's Point, NJ. Sab-BOT-age's 4<sup>th</sup> time participating at Duel on the Delaware. First "official" FRC competition fo ...the start of DEWBOT's first three qualifying matches approximately was on-time.
    8 KB (1,237 words) - 18:15, 23 October 2010
  • ...junction. We replaced the failed pivot (with our last spare), but not in time for the 2<sup>nd</sup> playoff match. :Our spare pivot was not kept up-ta-date and ready-to-use. This cost us time (although it is doubtful that replacement would have been fast enough even
    7 KB (1,061 words) - 16:40, 15 February 2011
  • * The VEX team - 103 roboteers, 14 robots, 2 full time playing fields (shown is a playing field and 24 transmitters ready for test
    842 bytes (134 words) - 02:57, 10 November 2010
  • :FRC - Need to make sure everyone is working the whole time, every time :More lead time, get DASD & local government there<br><br>
    3 KB (435 words) - 14:38, 18 October 2011
  • ...pits to talk to the teams and I want to say thanks for everyone that took time to talk to them.
    6 KB (1,057 words) - 22:28, 21 November 2010
  • The primary factor affecting climb time is minibot mass. No big surprise here. The lighter, the faster.<br> ...imizing wheel diameter/gear ratio can cut tenths of a second off the climb time.<br>
    6 KB (884 words) - 20:47, 11 April 2011
  • ...to a team of 20 students and 15 mentors with 3 alumni mentors. At the same time, our engineering skills have increased. Our robots have gone from unassumin ...and 5 off-season events. Last year our robot construction was completed in time for us to attend a pre-season event!
    16 KB (2,673 words) - 22:21, 23 February 2011
  • ...s and hands into designing and building a great robot. Paradoxically, the time seems both far too short and much too long. ...ibot climbs the pole with battery on-board in 4.5+ seconds - but not every time
    23 KB (3,294 words) - 22:53, 21 March 2011
  • ...nibot_110122_csm.jpg|Minibot coming together for the first (or ''FIRST''?) time
    5 KB (812 words) - 16:32, 15 February 2011
  • ...ckly, anyone can drive, uses less motors and processor, and can leave more time for working other aspects of the robot. However with this, sacrifice the ma :# The time required to change a pivot if it fails is too long. This needs to be reduc
    13 KB (1,996 words) - 12:24, 27 January 2015
  • :Match 16: Regional high score 114-25 at the time with 365 and 272 (thanks guys!) against 433, 223 and 3167.<br>
    9 KB (1,259 words) - 23:47, 30 April 2011
  • ...had lots of good autonomous routines and our driver skills were at an all time high. ...h captains were Downingtown's Beast, Phoenix and Lady Deathstrike. By the time alliance selection was over, all of the VEXMEN teams were on alliances.
    2 KB (268 words) - 01:13, 13 February 2011
  • ...onable driving distance (356 mi, about 6 hours). After our 2<sup>nd</sup> time participating here, I also have to add that I enjoy the good company.
    6 KB (895 words) - 16:37, 14 April 2011
  • ...the existing space is the ability to have playing fields available all the time. ::Minimum guaranteed time (to June 30, 2012)
    6 KB (909 words) - 14:38, 18 October 2011
  • When we have time, we'll extend this practice to the pivots. As mentioned above, this is jus
    13 KB (2,000 words) - 02:28, 12 July 2011
  • The primary factor affecting climb time is minibot mass. No big surprise here. The lighter, the faster.<br> ...imizing wheel diameter/gear ratio can cut tenths of a second off the climb time.<br>
    11 KB (1,719 words) - 15:57, 24 October 2011
  • ...deactivating both solenoids retracts the deployment cylinder. Deployment time dropped to 0.84s (σ = 0.1s). A good start, but the need to vent retractio
    7 KB (1,043 words) - 15:22, 20 April 2011
  • FRC Team 1640 (team Sab-BOT-age) competed for its second time (and 2<sup>nd</sup> consecutive year) in FRC's Championship, held in the Ed
    4 KB (663 words) - 02:35, 1 June 2012
  • ...ot, after nearly flawless performance in the qualifying matches, took this time to become unreliable (knocked off its launch-pad due to the rough play).<br ...n enormous setback when 365's arm broke during the 2nd semifinal match. A time-out was called for repairs.<br>
    12 KB (1,869 words) - 16:00, 20 May 2011

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)