Search results

From DEW Robotics
Jump to: navigation, search
  • ...en pin, strip, crimp and insert a new pin. 3 cents in parts, 5 minutes of time to repair a $20 motor! A big win for everyone!! ...alled and the final connections were made to the motors. Total connection time was less than an hour. This is a great sign that we can make major repairs
    6 KB (968 words) - 21:53, 25 February 2010
  • We ''never'' scored three balls in that time, in fact we only scored two the entire competition. Matches do often come d ...core a single goal by kicking, and only two by herding--both just one at a time, despite having three balls in front of us at one point. Most opposing robo
    13 KB (2,370 words) - 11:39, 10 July 2010
  • ...of our mentors has an newborn robototeer at home, this may limit how much time he can spend. We also have 4 mentors for 50 robototeers, we could use the
    3 KB (546 words) - 03:07, 17 January 2010
  • ...''. – Our official meeting night is Wednesday 6:30-8:30. With the short time between January 6 and when we go to Dock’Bot two weeks later, the VEX rob ...ial night is Wednesday night. If team members want to come to an optional time and work on the robot they can. Roboteers should use the robot workshop d
    4 KB (691 words) - 03:06, 17 January 2010
  • ...With the gift basket raffle we collected over $1000. Everyone had a great time and we look forward to doing it next year!
    994 bytes (142 words) - 01:40, 25 February 2010
  • {[(I)]}will be dealt with over a period of time
    2 KB (381 words) - 20:28, 15 September 2012
  • Image:DB6_on_its_feet_100203_csm.jpg|DEWBOT VI on its feet for the first time
    12 KB (1,784 words) - 00:37, 4 March 2010
  • 2) What time of day '''On a Friday around 6-11 or something around that'''
    3 KB (492 words) - 13:37, 27 January 2010
  • ...tbots and some sqaure bots. About 100 Lego Roboteers drove and had a great time. Thanks to Mike M for spending the day helping spread the word about VEX.
    1 KB (241 words) - 02:22, 5 February 2010
  • '''Funding''' We are having a tough time with sponsorship funding this year, if you know anyone that would be willin
    1 KB (224 words) - 02:23, 5 February 2010
  • '''Funding''' We are having a tough time with sponsorship funding this year, if you know anyone that would be willin
    1 KB (248 words) - 13:15, 16 February 2010
  • ...a team of 30 students and 15 mentors with 3 alumni mentors. At the same time our engineering skills have increased. Our robots have gone from unassumin ...nd 5 off-season events. This year our robot construction has completed in time for us to attend a pre-season event!
    12 KB (2,105 words) - 02:52, 12 March 2010
  • ...ome big shot full time robotics engineer, then you use these words all the time!)
    7 KB (1,063 words) - 01:35, 25 November 2012
  • ...0 Build Season, Team 1640 designed and fabricated a ''proxy chassis'' as a time-management tool. The ''proxy chassis'' duplicated the key geometry and con ...al robot chassis over to the Programming and Field sub-teams to allow them time to work uninterrupted, while the mechanical sub-team focused on making the
    4 KB (648 words) - 18:48, 22 March 2010
  • ..., but look back at it with fondness knowing that wouldn't have traded that time for anything. :I considered mentoring as a high school senior, and at the time thought 'you know, I should probably take at least freshman year off from F
    4 KB (628 words) - 00:20, 23 March 2010
  • The crab can scoot in any direction at any time to get itself out of tight spots - and that's our 'bot - innovative, state-
    2 KB (265 words) - 21:55, 2 April 2010
  • '''Funding''' We are having a tough time with sponsorship funding this year, if you know anyone that would be willin
    2 KB (286 words) - 20:54, 1 March 2010
  • ...earned from physics and math in a hands-on manner. We had to cultivate our time management skills to balance demanding schedules. We can utilize these new ...ual variety show. Our principals saw the fruits of our labor for the first time. They seemed to be proud of our accomplishments.
    14 KB (2,394 words) - 12:10, 12 March 2010
  • Image:VEX_DEC_Event_partys_over_100313_csm.jpg|The party's over - time to clean up
    5 KB (714 words) - 14:03, 8 June 2010
  • ...ice matches + practice field time worth of wear (about 90 minutes of drive time). The other three treads were not replaced at Drexel. *Wheel #4 does not calibrate correctly zz% of the time in the aa version of the calibration code. It is the only wheel with this p
    17 KB (2,903 words) - 12:23, 27 January 2015
  • ###We do things as a team - up and out on time
    4 KB (604 words) - 16:21, 29 December 2011
  • ...ge will be applied in the future and will be retrofit to current pivots as time allows.<br>
    9 KB (1,385 words) - 13:42, 13 June 2010
  • ...without problems. I suspect the charger; although the charging cycle and time for this battery appeared normal, the subsequent battery put on this charge ...erfinal (probably a casualty of the battery problem). Did not replace (no time). This caused steering issues in the quarterfinals, in combination with Pro
    10 KB (1,623 words) - 13:43, 13 June 2010
  • ...icates that she can correct via calibration, but this wastes valuable game time.
    11 KB (1,807 words) - 16:26, 7 November 2010
  • :* For the first time, team 1640 built two robots: ''Prime'' and ''Deux''. ''Prime'' goes to the ...ed in the [[DEWBOT VII FRC Championship | FRC Championship]] for the first time as a team.
    18 KB (2,699 words) - 05:44, 30 December 2012
  • ...ther new boy and started a beginning class on the spot. This was the first time I witnessed his teaching in action. By the end of the night nerves were gon ...and was again amazed by the passion they had for teaching. They took the time to show us how to build & program robots and also how to engage and inspire
    4 KB (719 words) - 02:52, 3 May 2010
  • The media team is small at 2-3 people working at any one time. Like the other teams they need desk space, internet access and power.
    9 KB (1,547 words) - 01:36, 10 June 2010
  • ...plates of the pivot had to be removed to change the treads. This is a very time consuming process. Also, there is the chance to incorrectly assemble the pi ...e often. Changing treads in the heat of competition is not desirable. Some time in October after input from many team members, we came up with bonding a bi
    3 KB (582 words) - 12:20, 27 January 2015
  • ...s repaired and on the field. The robots were moving the entire 2 1/2 hour time we were there.
    5 KB (817 words) - 16:38, 15 February 2011
  • ...ce skills ranging from mechanical fabrication to computer programming, and time management to leadership. Inventor and entrepreneur [http://usfirst.org/abo *'''''Employ''''' teamwork, leadership, time management, sportsmanship & problem solving
    12 KB (1,739 words) - 22:53, 16 October 2012
  • :Work was completed on 19-June, just in time for the [[Upper Uwchlan Block Party]]. ...ools and machinery. I picked up six sturdy work benches for our remaining time in DEC and of course our new home. Glick has a wide selection aluminum, st
    24 KB (3,796 words) - 01:06, 10 August 2011
  • ...s clutch''. This would continue to apply pinching force while at the same time avoiding motor stall, motor burn-out, excessive battery drain, and polycord :''Tempus fugit!.'' Only a week and a bit before IRI! Time to finish our work and test it all out.
    20 KB (3,300 words) - 16:39, 15 February 2011
  • ...), wheels (calibration/angles in autonomous), etc? What (processing power, time, etc) does this take?<br>
    10 KB (1,542 words) - 16:47, 13 July 2010
  • .... On the rather less elevated side, we often had plenty work to do in that time. ...eed to repair or replace that--sooner rather than later (though we'll have time enough after IRI). Secondary issue: we don't know what the diagnostic error
    8 KB (1,396 words) - 18:40, 9 August 2010
  • :This time good driving wasn't quite enough. Though to be fair, a working possessor pr ...perating, Carly coaching, and Clem and Rita as human players. Still, a fun time by all.
    8 KB (1,258 words) - 16:14, 25 July 2010
  • ...wonderful Jane Young, Alan, Andy and Mark of AndyMark fame and spent some time talking to Ed from Rochester. Rizzo met most of the judging staff and swapp ...-and-greet. I felt ''very'' (no, ''very'') young, but it was still a great time. The "Hi, I'm...on CD" and non-rocket science NEMO buttons were a good conv
    55 KB (9,882 words) - 16:39, 15 February 2011
  • ...ain contact and are responsible for the project/milestone's quality and on-time completion. Add your name and/or contact the supervisor to volunteer as a c
    4 KB (481 words) - 16:40, 15 February 2011
  • ...t charging (unplugged), and dead batteries to be easily identified (target time: 5 seconds, marginal: 20 seconds)
    2 KB (346 words) - 21:53, 20 July 2010
  • ...lace the robot safely within 10 seconds (marginal: 15 seconds or 3 people, time starts from robot held above the cart)
    3 KB (453 words) - 22:15, 20 July 2010
  • A ROBOT may only possess one (1) Game Piece at a time.
    2 KB (280 words) - 00:26, 25 February 2023
  • :On the way home, we continued an ancient and time-honored team tradition by spending the morning of Sunday, 20-July at the [h ...enjoy some sunshine and play with some younger Chester Countians. A good time was had by all.
    19 KB (2,840 words) - 21:44, 14 December 2014
  • ...Salem Community College, Carney's Point, NJ. Sab-BOT-age's 4<sup>th</sup> time participating at Duel on the Delaware. First "official" FRC competition fo ...the start of DEWBOT's first three qualifying matches approximately was on-time.
    8 KB (1,237 words) - 18:15, 23 October 2010
  • ...junction. We replaced the failed pivot (with our last spare), but not in time for the 2<sup>nd</sup> playoff match. :Our spare pivot was not kept up-ta-date and ready-to-use. This cost us time (although it is doubtful that replacement would have been fast enough even
    7 KB (1,061 words) - 16:40, 15 February 2011
  • * The VEX team - 103 roboteers, 14 robots, 2 full time playing fields (shown is a playing field and 24 transmitters ready for test
    842 bytes (134 words) - 02:57, 10 November 2010
  • :FRC - Need to make sure everyone is working the whole time, every time :More lead time, get DASD & local government there<br><br>
    3 KB (435 words) - 14:38, 18 October 2011
  • ...pits to talk to the teams and I want to say thanks for everyone that took time to talk to them.
    6 KB (1,057 words) - 22:28, 21 November 2010
  • The primary factor affecting climb time is minibot mass. No big surprise here. The lighter, the faster.<br> ...imizing wheel diameter/gear ratio can cut tenths of a second off the climb time.<br>
    6 KB (884 words) - 20:47, 11 April 2011
  • ...to a team of 20 students and 15 mentors with 3 alumni mentors. At the same time, our engineering skills have increased. Our robots have gone from unassumin ...and 5 off-season events. Last year our robot construction was completed in time for us to attend a pre-season event!
    16 KB (2,673 words) - 22:21, 23 February 2011
  • ...s and hands into designing and building a great robot. Paradoxically, the time seems both far too short and much too long. ...ibot climbs the pole with battery on-board in 4.5+ seconds - but not every time
    23 KB (3,294 words) - 22:53, 21 March 2011
  • ...nibot_110122_csm.jpg|Minibot coming together for the first (or ''FIRST''?) time
    5 KB (812 words) - 16:32, 15 February 2011

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)