Search results

From DEW Robotics
Jump to: navigation, search
  • ...ckly, anyone can drive, uses less motors and processor, and can leave more time for working other aspects of the robot. However with this, sacrifice the ma :# The time required to change a pivot if it fails is too long. This needs to be reduc
    13 KB (1,996 words) - 12:24, 27 January 2015
  • :Match 16: Regional high score 114-25 at the time with 365 and 272 (thanks guys!) against 433, 223 and 3167.<br>
    9 KB (1,259 words) - 23:47, 30 April 2011
  • ...had lots of good autonomous routines and our driver skills were at an all time high. ...h captains were Downingtown's Beast, Phoenix and Lady Deathstrike. By the time alliance selection was over, all of the VEXMEN teams were on alliances.
    2 KB (268 words) - 01:13, 13 February 2011
  • ...onable driving distance (356 mi, about 6 hours). After our 2<sup>nd</sup> time participating here, I also have to add that I enjoy the good company.
    6 KB (895 words) - 16:37, 14 April 2011
  • ...the existing space is the ability to have playing fields available all the time. ::Minimum guaranteed time (to June 30, 2012)
    6 KB (909 words) - 14:38, 18 October 2011
  • When we have time, we'll extend this practice to the pivots. As mentioned above, this is jus
    13 KB (2,000 words) - 02:28, 12 July 2011
  • The primary factor affecting climb time is minibot mass. No big surprise here. The lighter, the faster.<br> ...imizing wheel diameter/gear ratio can cut tenths of a second off the climb time.<br>
    11 KB (1,719 words) - 15:57, 24 October 2011
  • ...deactivating both solenoids retracts the deployment cylinder. Deployment time dropped to 0.84s (σ = 0.1s). A good start, but the need to vent retractio
    7 KB (1,043 words) - 15:22, 20 April 2011
  • FRC Team 1640 (team Sab-BOT-age) competed for its second time (and 2<sup>nd</sup> consecutive year) in FRC's Championship, held in the Ed
    4 KB (663 words) - 02:35, 1 June 2012
  • ...ot, after nearly flawless performance in the qualifying matches, took this time to become unreliable (knocked off its launch-pad due to the rough play).<br ...n enormous setback when 365's arm broke during the 2nd semifinal match. A time-out was called for repairs.<br>
    12 KB (1,869 words) - 16:00, 20 May 2011
  • FRC Team 1640 (team Sab-BOT-age) competed for its first time in FRC's Championship, held in the Edward Jones Dome, St. Louis MO. 27 stu
    11 KB (1,526 words) - 00:13, 1 May 2012
  • ...broken down a field since Hartford. The team worked together, had a great time, and our help was appreciated by our hosts.
    4 KB (659 words) - 10:43, 15 June 2013
  • '''Sunday - '''Most of us arrived at the Air Force Museum in time for the first tour of the Presidential and Experimental Aircraft Hangers. ...d took notes. Very clever idea, I might even remember to do it myself next time.
    27 KB (4,835 words) - 10:41, 15 June 2013
  • ::Takes time for IRS determination letter (low-end: 45 days for VEX)
    6 KB (803 words) - 14:36, 18 October 2011
  • ...ns. While we wanted to make this year our roller claw study (for real this time), but working in a living room, finished basement, and swimming pool makes ...using LabVIEW. Those who did not program the vending machine spent their time learning some of the ins and outs of LabVIEW.
    12 KB (1,777 words) - 14:27, 20 August 2011
  • ...ense of accomplishment. This is the very heart of the robotics year. The time we both live for and approach with a little dread. ...where we learn the details of the new game, and runs for 45 days, at which time the robot is [[DEWBOT_VIII_Final_Daze_Build_Season_Photo_Gallery#Tuesday_Fe
    24 KB (3,540 words) - 11:36, 20 April 2013
  • ...st meeting, where a lot of new thinking emerged (not surprising, given the time to think things over). The articulated strategy emerged at the end of the
    3 KB (463 words) - 20:11, 5 October 2011
  • :* Control & Drivetrain - Short time from autonomous start to top of ramp
    4 KB (575 words) - 20:23, 5 October 2011
  • ...ised.jpg|450px|right|thumb]]22-October-2011. Sab-BOT-age's 5<sup>th</sup> time participating at Duel on the Delaware. Also the first FRC competition for ...have done this at Creamery. This kept us from getting on-field programming time, limiting autonomous development.
    10 KB (1,743 words) - 21:23, 4 October 2012
  • This is the first time Sab-BOT-age had ever run two robots in a competition and my heartfelt thank
    11 KB (1,650 words) - 04:58, 18 November 2011
  • *Let’s not waste time or force students – let the kids do what they’re interested in (find ou
    2 KB (291 words) - 16:13, 29 December 2011
  • ...With the gift basket raffle we collected over $1000. Everyone had a great time and we look forward to doing it next year! ...b teams. Abington Bank supplied 50 pizzas that were gobbled down at lunch time. Thanks to all the parents that drove and braved the first snowfall of the
    12 KB (1,936 words) - 11:21, 28 December 2016
  • Sab-BOT-age's 4<sup>th</sup> time participating at [[DEWBOT VI Duel on the Delaware | Duel on the Delaware]]. ...ete for FIRST's highest award. We did not win, the winning team was a two time Chairman's winner.
    23 KB (3,603 words) - 11:21, 28 December 2016
  • ...s and hands into designing and building a great robot. Paradoxically, the time seems both far too short and much too long. :*Prepare Bridge Manipulation appendage for test. Test, specially for time required and any impact upon landing.
    12 KB (1,679 words) - 02:32, 26 February 2012
  • ...ncludes delay for specified time, shoot at specified power, move straight (time and power), crab at specified angle, and "spit out" balls; switches select
    2 KB (354 words) - 14:47, 22 April 2012
  • ...remind team Sab-bot-age that there are only 19 days of build season left. Time to work hard, winter is wasting away. (Phil is on the left)
    7 KB (976 words) - 23:27, 16 February 2012
  • ....jpg|Kira, Tom, Ian & Patrick D roll DEWBOT out to the field for the first time
    3 KB (454 words) - 02:28, 26 February 2012
  • * Barrier crossing design used up a lot of brain time & fabrication time, which might have been better applied elsewhere ...sts suggest we succeeded with the second as well (but let's give this some time). The ability to adapt drive performance in software to meet game needs is
    16 KB (2,396 words) - 12:25, 27 January 2015
  • With virtually no time for software & hardware testing or driver training before the robot was sea ...get a rookie team's autonomous up and running in their non-existent spare time. Way to go!
    15 KB (2,414 words) - 00:00, 29 March 2012
  • ...get a rookie team's autonomous up and running in their non-existent spare time. Way to go! ...get a rookie team's autonomous up and running in their non-existent spare time. Way to go!
    6 KB (932 words) - 00:16, 29 March 2012
  • ...college. An autistic student first joined Team 1640 as a programmer. Over time, the programmer learned to communicate his ideas effectively, as well as le ...that education was the best method to spread FIRST’s initiatives. At the time, the school district researched and considered building a third high school
    15 KB (2,317 words) - 23:41, 3 April 2012
  • ...native top hopper feed; mechanism still works but hopper has degraded over time due to non-use;
    10 KB (1,598 words) - 00:38, 22 August 2012
  • This is the first time Sab-BOT-age had ever run two robots in a competition and thanks go out to a ...ised.jpg|210px|right|thumb]]22-October-2011. Sab-BOT-age's 5<sup>th</sup> time participating at Duel on the Delaware. Also the first FRC competition for
    17 KB (2,745 words) - 11:21, 28 December 2016
  • ...ccer goal was worth 1 (2 in autonomous). You could only have one ball at a time and you couldn't lift it off the ground. You had to stay within your frame ...rt a 60" tall but could grow to 108". They could extend one appendage at a time up to 14" inches outside their frame perimeter, except during the 30 second
    5 KB (779 words) - 03:04, 26 November 2012
  • ...p://robotics.agnesirwin.org/ Femme Tech Fatale]) Pivot (not working at the time)
    3 KB (396 words) - 22:47, 20 April 2013
  • ...on competition. We'd been looking forward to working with MORT for a long time and the experience was even better than expected! Congratulations to winne On to Einstein Field! 1640's first time. We started well against Galileo's champions (teams 1241 ([http://www.theo
    11 KB (1,627 words) - 11:20, 28 December 2016
  • ...t the Westtown School) and 1640 and was a huge success. This was the first time the two teams had worked together to host a robotics tournament. According
    15 KB (2,226 words) - 11:23, 28 December 2016
  • ...cover the details of who we played with and the results. We spent a lot of time on the practice field, mostly working on autonomous until we discovered the
    4 KB (566 words) - 04:37, 10 September 2012
  • ...cision to cross the barrier with pivot drive also committed a lot of brain time to the drive train and chassis design
    12 KB (1,824 words) - 00:23, 7 September 2012
  • ...and we devoted a lot of resources to this (mind time, design time, machine time, mass, space & $s). We built an accurate, welded pyramid and a horizontal :On to Einstein Field! 1640's first time. We started well against Galileo's champions (teams 1241 ([http://www.theo
    20 KB (2,892 words) - 04:03, 29 October 2015
  • ...ir hearts, minds and hands into designing and building a great robot. The time is both far too short and much too long. :*Welder working first time since Waterloo. Kira & Marina are welding graduates!
    18 KB (2,528 words) - 23:08, 26 August 2013
  • Primarily as a just-in-time training approach (it's more fun that way!), we've got several FRC design c
    7 KB (1,096 words) - 22:56, 20 June 2013
  • * '''Time''' - CNC machining takes time; so does the assembly of complex mechanisms; as a result 1640 has finished ...Driver training''' is not optional with swerve. Frankly, we train all the time and participate in a lot of off-season competitions for real training. Use
    18 KB (2,732 words) - 02:39, 28 February 2023
  • ...us to repair tools or equipment that would otherwise be discarded, saving time and expense<br><br> ...that the quality of our welding work is as good as it can be when it comes time to build the next robot. <br><br>
    22 KB (4,000 words) - 03:11, 31 October 2015
  • 10 November, 2012 in Ambler, PA. This is Sab-BOT-age's 6<sup>th</sup> time at Ramp Riot. It's always a fantastic event, hosted by our MAR Championship
    6 KB (1,004 words) - 20:53, 18 November 2012
  • :# Pivot tubes were not secure within the pivot tops and shifted over time. Small and mostly angular shifts resulted in loss of calibration. Large s ...easured following FRC cost guidelines) but also mass, manpower and machine time.
    8 KB (1,161 words) - 01:33, 19 February 2017
  • ...en a strong suit for Team 1640. But things change. We spent far too much time looking for things last year.
    3 KB (528 words) - 21:09, 24 November 2012
  • ...+hr/week during Build Season (Jan-Feb). This ranges all the way up to full-time equivalent positions for top technical mentors. ([[#What can parents do bes
    6 KB (907 words) - 18:03, 6 November 2013
  • ...VIII IRI Photo Gallery|photo gallery]] provides images. We spent a lot of time on the practice field, mostly working on autonomous until we discovered the
    13 KB (1,962 words) - 11:20, 28 December 2016
  • #Minimize $$, time and resource cost - use available (preferably used) materials *Time: ≤1hr construction (+ ≤20min planning)
    9 KB (1,359 words) - 05:47, 30 December 2012

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)